{"id":94639,"date":"2025-02-14T15:36:44","date_gmt":"2025-02-14T15:36:44","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94639"},"modified":"2025-02-14T15:36:46","modified_gmt":"2025-02-14T15:36:46","slug":"194-mil-guariquenos-se-benefician-con-mantenimiento-en-la-linea-horqueta-calabozo-ii-230-kv","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94639","title":{"rendered":"194 mil guarique\u00f1os se benefician con mantenimiento en la l\u00ednea Horqueta &#8211; Calabozo II 230 kV"},"content":{"rendered":"\n<p><strong>Estado Gu\u00e1rico.-&nbsp;<\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 labores de mantenimiento preventivo en la l\u00ednea 230 kV Horqueta &#8211; Calabozo II, torre 384, para optimizar el servicio de energ\u00eda brindado a 194 mil habitantes de los estados Gu\u00e1rico y Apure.<\/p>\n\n\n\n<p>Los trabajos realizados consistieron en pruebas el\u00e9ctricas, sustituci\u00f3n de puentes, limpieza general y ajuste de componentes en la estructura.<\/p>\n\n\n\n<p>Adicionalmente, se efectuaron inspecciones minuciosas para asegurar la operatividad de esta importante l\u00ednea de alta tensi\u00f3n que garantiza la transmisi\u00f3n de energ\u00eda, espec\u00edficamente a las poblaciones de Calabozo, El Sombrero y Bajo Apure.<\/p>\n\n\n\n<p>Estas acciones se llevan a cabo con el objetivo de proporcionar un servicio confiable a los usuarios, reforzando el compromiso de Corpoelec con el bienestar de las comunidades y la mejora continua del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Gu\u00e1rico.-&nbsp;La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) realiz\u00f3 labores de mantenimiento preventivo en la l\u00ednea 230 kV Horqueta &#8211; Calabozo II,<\/p>\n","protected":false},"author":24,"featured_media":94640,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,2729,11,2744,46],"class_list":["post-94639","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-guarico","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94639","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94639"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94639\/revisions"}],"predecessor-version":[{"id":94641,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94639\/revisions\/94641"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94640"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94639"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94639"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94639"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}