{"id":94668,"date":"2025-02-15T13:44:30","date_gmt":"2025-02-15T13:44:30","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94668"},"modified":"2025-02-15T13:44:32","modified_gmt":"2025-02-15T13:44:32","slug":"corpoelec-instala-transformadores-en-comunidades-tachirenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94668","title":{"rendered":"Corpoelec instala transformadores en comunidades tachirenses"},"content":{"rendered":"\n<p><br><strong>Estado T\u00e1chira.- <\/strong>Con la instalaci\u00f3n de seis trasformadores, la clase obrera trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), fortalece el suministro de electricidad a m\u00e1s de 305 familias tachirenses.<br><br>Los trabajos fueron ejecutados por las cuadrillas del Distrito San Antonio en el eje fronterizo, donde se instalaron cuatro trasformadores entre 25 y 37.5 kVA, en beneficio de los habitantes de los sectores Las Casitas, Cristal del Bosque, Urb. Integraci\u00f3n 1, Barrio San Isidro y las zonas comerciales de Ure\u00f1a.<br><br>Asimismo, el personal t\u00e9cnico, atendi\u00f3 la poblaci\u00f3n de Santa Ana en el municipio C\u00f3rdoba y la urbanizaci\u00f3n\u00a0Pirineos 1 en San Crist\u00f3bal, con la sustituci\u00f3n de 2 equipos el\u00e9ctricos\u00a0de 25 y 50 kVA, respectivamente, dando respuesta a la solicitud que los usuarios realizan a trav\u00e9s del 1&#215;10 del Buen Gobierno.<br><br>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec ratifican su compromiso con el bienestar de la ciudadan\u00eda tachirense, en aras de optimizar un servicio el\u00e9ctrico de calidad a la poblaci\u00f3n en la entidad andina.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- Con la instalaci\u00f3n de seis trasformadores, la clase obrera trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), fortalece el<\/p>\n","protected":false},"author":24,"featured_media":94669,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,2700,46],"class_list":["post-94668","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94668"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94668\/revisions"}],"predecessor-version":[{"id":94670,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94668\/revisions\/94670"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94669"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94668"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94668"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}