{"id":94776,"date":"2025-02-18T18:57:49","date_gmt":"2025-02-18T18:57:49","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94776"},"modified":"2025-02-19T14:04:13","modified_gmt":"2025-02-19T14:04:13","slug":"500-familias-en-los-corales-se-benefician-con-instalacion-de-transformador-sumergible","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94776","title":{"rendered":"500 familias en Los Corales se benefician con instalaci\u00f3n de transformador sumergible"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) favoreci\u00f3 a los residentes de la Urbanizaci\u00f3n Parque Mar de Los Corales, con la instalaci\u00f3n de un transformador sumergible en atenci\u00f3n a las solicitudes realizadas a trav\u00e9s de la VenApp del sistema 1&#215;10 del Buen Gobierno.&nbsp;<\/p>\n\n\n\n<p>En este sentido, el personal especializado coloc\u00f3 un equipo potencia de 1000 kVA, para fortalecer la distribuci\u00f3n de energ\u00eda en los 2 edificios de la residencia, con el cual se beneficiaron 590 familias de esta zona tur\u00edstica y residencial de la parroquia Caraballeda.&nbsp;<\/p>\n\n\n\n<p>Con la puesta en funcionamiento del transformador se adecu\u00f3 la red de media tensi\u00f3n del circuito A4 de Caraballeda, para asegurar el \u00f3ptimo desempe\u00f1o del sistema el\u00e9ctrico en esta localidad.&nbsp;<\/p>\n\n\n\n<p>Corpoelec contin\u00faa dando respuestas inmediatas para brindar un servicio el\u00e9ctrico seguro y de calidad a la poblaci\u00f3n del estado La Guaira.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) favoreci\u00f3 a los residentes de la Urbanizaci\u00f3n Parque Mar de Los Corales,<\/p>\n","protected":false},"author":24,"featured_media":94777,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,2743,11,2744,46],"class_list":["post-94776","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-la-guaira","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94776","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94776"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94776\/revisions"}],"predecessor-version":[{"id":94784,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94776\/revisions\/94784"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94777"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94776"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94776"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94776"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}