{"id":94800,"date":"2025-02-19T17:21:20","date_gmt":"2025-02-19T17:21:20","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94800"},"modified":"2025-02-19T17:21:22","modified_gmt":"2025-02-19T17:21:22","slug":"mantenimiento-preventivo-en-la-subestacion-barinas-i-favorece-a-mas-de-100-mil-usuarios","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94800","title":{"rendered":"Mantenimiento preventivo en la Subestaci\u00f3n Barinas I favorece a m\u00e1s de 100 mil usuarios"},"content":{"rendered":"\n<p><strong>Estado Barinas.-<\/strong> Maniobras preventivas en la Subestaci\u00f3n Barinas I, ubicada en el estado Barinas, realiz\u00f3 la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), para fortalecer el funcionamiento de la infraestructura que garantiza el suministro de energ\u00eda a m\u00e1s de 100 mil usuarios de la entidad llanera.<\/p>\n\n\n\n<p>Las labores planificadas, con el prop\u00f3sito de optimizar el rendimiento de las l\u00edneas 115 kV Barinas IV y P\u00e1ez, contemplaron la limpieza de los interruptores, verificaci\u00f3n de componentes, ajustes de partes y adecuaciones de piezas.<\/p>\n\n\n\n<p>Estas acciones, tambi\u00e9n impactan en el proceso de distribuci\u00f3n del fluido el\u00e9ctrico que respaldan la continuidad del servicio en comunidades de los municipios Barinas, Bol\u00edvar y Obispos<\/p>\n\n\n\n<p>De igual manera, los trabajos en la instalaci\u00f3n el\u00e9ctrica ejecutados por el personal especializado de la Gerencia de Transmisi\u00f3n, aseguran operatividad de los equipos de potencia.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.- Maniobras preventivas en la Subestaci\u00f3n Barinas I, ubicada en el estado Barinas, realiz\u00f3 la clase trabajadora de la<\/p>\n","protected":false},"author":24,"featured_media":94801,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2698,2691,11,2744,46],"class_list":["post-94800","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-barinas","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94800","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94800"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94800\/revisions"}],"predecessor-version":[{"id":94802,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94800\/revisions\/94802"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94801"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94800"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94800"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94800"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}