{"id":94880,"date":"2025-02-21T18:53:17","date_gmt":"2025-02-21T18:53:17","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94880"},"modified":"2025-02-21T18:53:19","modified_gmt":"2025-02-21T18:53:19","slug":"beneficiadas-mas-de-150-familias-tachirenses-con-instalacion-de-trasformadores","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94880","title":{"rendered":"Beneficiadas m\u00e1s de 150 familias tachirenses con instalaci\u00f3n de trasformadores"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), favoreci\u00f3 a m\u00e1s de 150 familias del eje metropolitano y la zona sur del estado T\u00e1chira, con la instalaci\u00f3n de dos transformadores de distribuci\u00f3n de  25 y 37.5 kVA, respectivamente.<\/p>\n\n\n\n<p>Las maniobras efectuadas por el personal t\u00e9cnico adscrito a la Gerencia de Distribuci\u00f3n, permitieron atender a los habitantes del Barrio Lourdes, con la instalaci\u00f3n de un transformador de 25 kVA, en el municipio San Crist\u00f3bal.<\/p>\n\n\n\n<p>Asimismo, al sur del estado, en el municipio C\u00f3rdoba, cuadrillas de Corpoelec favorecieron a la poblaci\u00f3n del sector El Chorrero, donde colocaron el equipo el\u00e9ctrico de 37.5 kVA, para mejorar la distribuci\u00f3n de energ\u00eda en esa localidad.<\/p>\n\n\n\n<p>La instalaci\u00f3n de estos equipos forma parte de las respuestas a la solicitud que realizan las comunidades a trav\u00e9s de la VenApp del 1\u00d710 del Buen Gobierno.<\/p>\n\n\n\n<p><strong>Prensa MPPEEC-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), favoreci\u00f3 a m\u00e1s de 150 familias del eje metropolitano y la zona sur<\/p>\n","protected":false},"author":24,"featured_media":94881,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,2700,46],"class_list":["post-94880","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94880","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94880"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94880\/revisions"}],"predecessor-version":[{"id":94882,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94880\/revisions\/94882"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94881"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94880"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94880"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94880"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}