{"id":94920,"date":"2025-02-24T14:12:18","date_gmt":"2025-02-24T14:12:18","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94920"},"modified":"2025-02-24T14:12:20","modified_gmt":"2025-02-24T14:12:20","slug":"atendidos-26-mil-usuarios-sucrenses-con-instalacion-de-interruptores-en-la-subestacion-guaraunos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94920","title":{"rendered":"Atendidos 26 mil usuarios sucrenses con instalaci\u00f3n de interruptores en la subestaci\u00f3n Guaraunos"},"content":{"rendered":"\n<p><strong>Estado Sucre.-<\/strong> Para optimizar la infraestructura el\u00e9ctrica en la zona de Paria del estado Sucre, cuadrillas operativas de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), realiz\u00f3 la instalaci\u00f3n de dos interruptores autom\u00e1ticos en la subestaci\u00f3n Guaraunos, con la finalidad de garantizar la distribuci\u00f3n de energ\u00eda el\u00e9ctrica m\u00e1s eficiente y confiable a 26 mil familias del municipio Ben\u00edtez del estado Sucre.<\/p>\n\n\n\n<p>Las maniobras se basaron en el montaje de equipos completamente nuevos marca chardon group de 15 Kv de 800 amp en los circuitos Pilar I y Pilar II y sus accesorios, para fortalecer la operatividad del sistema el\u00e9ctrico.<\/p>\n\n\n\n<p>Asimismo, las mejoras en la infraestructura el\u00e9ctrica tambi\u00e9n contemplaron lavado, trapeado, medici\u00f3n de carga y tensi\u00f3n, as\u00ed como ajuste de torniller\u00eda en los equipos de potencias y elementos que integran la infraestructura el\u00e9ctrica.<\/p>\n\n\n\n<p>Las actividades fueron ejecutadas por la Divisi\u00f3n de Mantenimiento Especializado, asegurando que cada tarea se realice de acuerdo a lo planificado, reafirmando su compromiso de seguir trabajando en pro del desarrollo el\u00e9ctrico del estado y la mejora continua de nuestros servicios.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Sucre.- Para optimizar la infraestructura el\u00e9ctrica en la zona de Paria del estado Sucre, cuadrillas operativas de la Corporaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":94921,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,2693,46],"class_list":["post-94920","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-sucre","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94920","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94920"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94920\/revisions"}],"predecessor-version":[{"id":94922,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94920\/revisions\/94922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94921"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}