{"id":94968,"date":"2025-02-25T15:19:02","date_gmt":"2025-02-25T15:19:02","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=94968"},"modified":"2025-02-25T15:19:04","modified_gmt":"2025-02-25T15:19:04","slug":"inspeccionan-lineas-de-transmision-sobre-el-rio-orinoco","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=94968","title":{"rendered":"Inspeccionan l\u00edneas de transmisi\u00f3n sobre el r\u00edo Orinoco"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.- <\/strong>Con la finalidad de garantizar la calidad y continuidad del servicio el\u00e9ctrico, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) a trav\u00e9s de la Gerencia de Transmisi\u00f3n del estado Bol\u00edvar, inspeccionaron tramo a tramo, las tres torres sobre el r\u00edo Orinoco de la L\u00ednea Guayana \u201cB\u201d &#8211; Palital a 400kV, para descartar anomal\u00edas que puedan intervenir en sistema el\u00e9ctrico.<\/p>\n\n\n\n<p>Para la realizaci\u00f3n de este trabajo, los linieros escalaron estructuras de m\u00e1s de 150 metros de altura, rumbo a la cadena de aisladores, ubicados en la parte superior de las torres el\u00e9ctricas.<\/p>\n\n\n\n<p>Estas inspecciones, permiten realizar mantenimientos preventivos que garanticen la confiabilidad de esta importante red el\u00e9ctrica, la cual suministra energ\u00eda a cinco estados del suroriente del pa\u00eds, como Bol\u00edvar Anzo\u00e1tegui, Monagas, Sucre y Nueva Esparta.<\/p>\n\n\n\n<p>La estatal el\u00e9ctrica planifica y ejecuta labores que permitan asegurar el fortalecimiento del sistema el\u00e9ctrico, para contribuir con el buen vivir de los venezolanos.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- Con la finalidad de garantizar la calidad y continuidad del servicio el\u00e9ctrico, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) a<\/p>\n","protected":false},"author":24,"featured_media":94969,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2723,2691,11,2744,46],"class_list":["post-94968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-bolivar","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=94968"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94968\/revisions"}],"predecessor-version":[{"id":94970,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/94968\/revisions\/94970"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/94969"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=94968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=94968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=94968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}