{"id":95050,"date":"2025-02-27T14:50:01","date_gmt":"2025-02-27T14:50:01","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95050"},"modified":"2025-02-27T14:50:03","modified_gmt":"2025-02-27T14:50:03","slug":"17-mil-familias-yaracuyanas-favorecidas-con-el-mantenimiento-de-la-subestacion-chivacoa","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95050","title":{"rendered":"17 mil familias yaracuyanas favorecidas con el mantenimiento de la Subestaci\u00f3n Chivacoa"},"content":{"rendered":"\n<p><strong>Estado Yaracuy.-<\/strong> Para favorecer de manera directa a 17 mil familias de las parroquias Chivacoa y Campo El\u00edas del municipio Bruzual en Yaracuy, se llev\u00f3 a cabo el mantenimiento a la Subestaci\u00f3n Chivacoa 115\/13.8kV.<\/p>\n\n\n\n<p>Las maniobras t\u00e9cnicas estuvieron a cargo de los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), adscritos a la Gerencia de Transmisi\u00f3n, ejecutando limpieza en las conexiones y sistemas de aislamiento, los pasamuros de l\u00edneas, mantenimiento a equipos de potencia y pruebas el\u00e9ctricas asociados al transformador n\u00famero #1 de 115\/13.8 kV y mantenimiento y ajuste de la torniller\u00eda.<\/p>\n\n\n\n<p>Igualmente, de manera simult\u00e1nea realizaron en esta importante instalaci\u00f3n el\u00e9ctrica la correcci\u00f3n de puntos calientes, sustituci\u00f3n de componentes el\u00e9ctricos y pruebas el\u00e9ctricas al transformador #1 de la subestaci\u00f3n.<\/p>\n\n\n\n<p>Corpoelec contin\u00faa realizando los trabajos de mantenimiento integral en la red de transmisi\u00f3n y distribuci\u00f3n el\u00e9ctrica, para mejorar la calidad de vida de la poblaci\u00f3n yaracuyana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Yaracuy.- Para favorecer de manera directa a 17 mil familias de las parroquias Chivacoa y Campo El\u00edas del municipio<\/p>\n","protected":false},"author":24,"featured_media":95051,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,46,2726],"class_list":["post-95050","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela","tag-yaracuy"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95050","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95050"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95050\/revisions"}],"predecessor-version":[{"id":95052,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95050\/revisions\/95052"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95051"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95050"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95050"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95050"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}