{"id":95090,"date":"2025-02-28T16:09:06","date_gmt":"2025-02-28T16:09:06","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95090"},"modified":"2025-02-28T16:09:07","modified_gmt":"2025-02-28T16:09:07","slug":"efectuan-trabajos-correctivos-en-circuitos-de-merida","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95090","title":{"rendered":"Efect\u00faan trabajos correctivos en circuitos de M\u00e9rida"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.-<\/strong> Para avanzar con los diferentes planes y proyectos para el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN), la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) en M\u00e9rida, efect\u00faa una serie de trabajos correctivos y preventivos, con la finalidad de revisar y sustituir equipos estrat\u00e9gicos en los diferentes circuitos de la entidad.<\/p>\n\n\n\n<p>En esta oportunidad, cuadrillas adscritas a L\u00edneas Energizadas y Centro de Servicio El P\u00e1ramo, procedieron a la construcci\u00f3n de un nuevo punto de seccionamiento en el sector Los Frailes del municipio Cardenal Quintero, donde se reubicaron las l\u00edneas con sus respectivos puentes de alta tensi\u00f3n, lo cual permitir\u00e1 efectuar diferentes maniobras, para la transferencia de carga en casos de emergencia.<\/p>\n\n\n\n<p>Estas acciones en favor del SEN, benefician a los usuarios del Eje Territorial P\u00e1ramo meride\u00f1o, especialmente a las poblaciones de Santo Domingo y Timones, localidades con vocaci\u00f3n tur\u00edstica y agr\u00edcola, donde se desarrollan importantes proyectos econ\u00f3micos para el desarrollo de la naci\u00f3n.<\/p>\n\n\n\n<p>Corpoelec trabaja en favor de las comunidades meride\u00f1as, mediante la planificaci\u00f3n y puesta en marcha de proyectos que apunten a fortalecer las redes el\u00e9ctricas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- Para avanzar con los diferentes planes y proyectos para el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN), la Corporaci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":95091,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,2742,11,2744,46],"class_list":["post-95090","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-merida","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95090"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95090\/revisions"}],"predecessor-version":[{"id":95092,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95090\/revisions\/95092"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95091"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}