{"id":95117,"date":"2025-03-01T17:14:43","date_gmt":"2025-03-01T17:14:43","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95117"},"modified":"2025-03-01T17:14:45","modified_gmt":"2025-03-01T17:14:45","slug":"mas-de-mil-familias-tachirenses-favorecidas-con-mantenimiento-preventivo-a-subestaciones-electricas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95117","title":{"rendered":"M\u00e1s de mil familias tachirenses favorecidas con mantenimiento preventivo a subestaciones el\u00e9ctricas"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.- <\/strong>Con el prop\u00f3sito de optimizar la red distribuci\u00f3n el\u00e9ctrica, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), atendi\u00f3 con labores de mantenimiento preventivo un total de 11 subestaciones para garantizar el suministro el\u00e9ctrico a m\u00e1s de mil familias tachirenses.<\/p>\n\n\n\n<p>Los trabajos preventivos fueron ejecutados por las cuadrillas adscritas a la Gerencia Estadal de Programaci\u00f3n y Control de Vegetaci\u00f3n, logrando desmalezar, limpiar y fumigar en las \u00e1reas operativas, perimetrales y cortafuegos de las subestaciones Rubio, Pregonero, San Antonio, Uribante, Col\u00f3n, El Corozo, San Crist\u00f3bal II, San Pedro, Baci, La Fr\u00eda y El Pi\u00f1al.<\/p>\n\n\n\n<p>Igualmente, el personal de Corpoelec, a trav\u00e9s del plan Pica y Poda benefici\u00f3 la subestaci\u00f3n La Vueltosa, ubicada en el municipio Padre Noguera, l\u00edmite entre T\u00e1chira y M\u00e9rida de la entidad andina.<\/p>\n\n\n\n<p>Con estas maniobras, la empresa el\u00e9ctrica fortalece la operatividad y buen funcionamiento de los equipos que generan y distribuyen el suministro de electricidad para los usuarios de la regi\u00f3n suroccidental del pa\u00eds.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- Con el prop\u00f3sito de optimizar la red distribuci\u00f3n el\u00e9ctrica, la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), atendi\u00f3 con labores de<\/p>\n","protected":false},"author":24,"featured_media":95118,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,2700,46],"class_list":["post-95117","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95117","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95117"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95117\/revisions"}],"predecessor-version":[{"id":95119,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95117\/revisions\/95119"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95118"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}