{"id":95190,"date":"2025-03-06T00:04:59","date_gmt":"2025-03-06T00:04:59","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95190"},"modified":"2025-03-06T00:17:49","modified_gmt":"2025-03-06T00:17:49","slug":"ministro-marquez-constata-reimpulso-operativo-de-instalaciones-electricas-de-tachira","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95190","title":{"rendered":"Ministro M\u00e1rquez constata reimpulso operativo de instalaciones el\u00e9ctricas de T\u00e1chira"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> En un recorrido destinado a constatar los avances de las labores de recuperaci\u00f3n integral de instalaciones del Sistema El\u00e9ctrico Nacional (SEN), el ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, inspeccion\u00f3 las instalaciones La Vueltosa y San Agat\u00f3n que forman parte del Complejo Hidroel\u00e9ctrico Uribante Caparo; y la Planta Termoel\u00e9ctrica T\u00e1chira, ubicadas en la regi\u00f3n sur occidental del pa\u00eds.<\/p>\n\n\n\n<p>Acompa\u00f1ado por trabajadores y trabajadoras de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) evalu\u00f3 el alcance de las jornadas de mantenimiento preventivo y correctivo que se realizan en la infraestructura el\u00e9ctrica, as\u00ed como maniobras de alto impacto para robustecer el proceso de generaci\u00f3n y transmisi\u00f3n de energ\u00eda a estados andinos y llaneros.<\/p>\n\n\n\n<p>Estas acciones se inscriben en el Plan Nacional de Inspecciones y Mantenimiento Integral, responden a las instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, para garantizar un suministro continuo, eficiente y de calidad mediante la mejora progresiva del Sistema El\u00e9ctrico Nacional.<\/p>\n\n\n\n<p>Prensa MPPEE &#8211; Corpoelec<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- En un recorrido destinado a constatar los avances de las labores de recuperaci\u00f3n integral de instalaciones del Sistema<\/p>\n","protected":false},"author":24,"featured_media":95191,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,15,7],"tags":[2691,11,2744,2700,46],"class_list":["post-95190","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-nacionales","category-sen","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95190","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95190"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95190\/revisions"}],"predecessor-version":[{"id":95193,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95190\/revisions\/95193"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95191"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95190"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95190"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95190"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}