{"id":95440,"date":"2025-03-14T16:40:24","date_gmt":"2025-03-14T16:40:24","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95440"},"modified":"2025-03-14T16:40:26","modified_gmt":"2025-03-14T16:40:26","slug":"ejecutan-mantenimiento-preventivo-y-correctivo-en-subestaciones-de-trujillo","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95440","title":{"rendered":"Ejecutan mantenimiento preventivo y correctivo en subestaciones de Trujillo"},"content":{"rendered":"\n<p><strong>Estado Trujillo.- <\/strong>La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecut\u00f3 labores de mantenimiento preventivo y correctivo en cinco subestaciones el\u00e9ctricas de 115 y 230KV en Trujillo, garantizando la optimizaci\u00f3n del sistema el\u00e9ctrico a m\u00e1s de 8 mil usuarios.<\/p>\n\n\n\n<p>Los trabajos ejecutados por el personal de Transmisi\u00f3n, consistieron en la correcci\u00f3n de puntos calientes, limpieza y ajuste de conexiones, lubricaci\u00f3n en los equipos de potencia, verificaci\u00f3n en los bancos de bater\u00edas, pruebas el\u00e9ctricas y funcionales, mantenimiento en las salas de mando y a las salidas de los circuitos 13.8kV.<\/p>\n\n\n\n<p>En esta oportunidad, fueron atendidas las subestaciones el\u00e9ctricas Buena Vista (230kV), Valera I y II, Monay y Caja Seca (115kV), permitiendo contribuir en la estabilizaci\u00f3n y continuidad del servicio el\u00e9ctrico en la entidad trujillana.<\/p>\n\n\n\n<p>Corpoelec reafirma el compromiso de brindar un servicio confiable para la comodidad del pueblo trujillano, cumpliendo con los lineamientos establecidos por el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Trujillo.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecut\u00f3 labores de mantenimiento preventivo y correctivo en cinco<\/p>\n","protected":false},"author":24,"featured_media":95441,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,11,2744,2702,46],"class_list":["post-95440","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-trujillo","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95440","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95440"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95440\/revisions"}],"predecessor-version":[{"id":95442,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95440\/revisions\/95442"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95441"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95440"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95440"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95440"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}