{"id":95496,"date":"2025-03-15T19:32:38","date_gmt":"2025-03-15T19:32:38","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95496"},"modified":"2025-03-15T19:32:39","modified_gmt":"2025-03-15T19:32:39","slug":"instalan-nuevo-reconectador-de-15-kv-en-la-subestacion-lagunillas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95496","title":{"rendered":"Instalan nuevo reconectador de 15 kV en la subestaci\u00f3n Lagunillas"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.- <\/strong>Dando continuidad a los trabajos de recuperaci\u00f3n en la subestaci\u00f3n Lagunillas del estado M\u00e9rida, el personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) instal\u00f3 un nuevo equipo reconectador de 15 kV, en la salida del circuito \u00abLa Trampa\u00bb.<\/p>\n\n\n\n<p>Esta labor correctiva, efectuada por el personal de las diferentes gerencias de la estatal el\u00e9ctrica en M\u00e9rida, permitir\u00e1 fortalecer la operatividad en la subestaci\u00f3n y brindar\u00e1 mayor estabilidad del servicio el\u00e9ctrico, en gran parte de las comunidades de los municipios Sucre y Campo El\u00edas.<\/p>\n\n\n\n<p>Luego de cumplirse los trabajos de instalaci\u00f3n del equipo para alta tensi\u00f3n, se realizaron todas las pruebas funcionales correspondientes al caso, las cuales arrojaron resultados satisfactorios en cuanto a la operatividad del reconectador, con lo cual se cumple en su totalidad la recuperaci\u00f3n de la subestaci\u00f3n Lagunillas, ubicada en el sector La Huerta del municipio Sucre.<\/p>\n\n\n\n<p>Corpoelec brinda una respuesta r\u00e1pida y eficiente a las comunidades meride\u00f1as en materia de servicios p\u00fablicos, demostrando del compromiso del Gobierno Bolivariano, a trav\u00e9s del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), en garantizar la continuidad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- Dando continuidad a los trabajos de recuperaci\u00f3n en la subestaci\u00f3n Lagunillas del estado M\u00e9rida, el personal de la<\/p>\n","protected":false},"author":24,"featured_media":95497,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,30],"tags":[2691,2742,11,2744,46],"class_list":["post-95496","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mppee","category-regionales","tag-corpoelec","tag-merida","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95496","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95496"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95496\/revisions"}],"predecessor-version":[{"id":95498,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95496\/revisions\/95498"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95497"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95496"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95496"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95496"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}