{"id":95505,"date":"2025-03-17T14:08:00","date_gmt":"2025-03-17T14:08:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95505"},"modified":"2025-03-17T14:08:02","modified_gmt":"2025-03-17T14:08:02","slug":"optimizan-servicio-electrico-con-mantenimiento-preventivo-en-portuguesa","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95505","title":{"rendered":"Optimizan servicio el\u00e9ctrico con mantenimiento preventivo en Portuguesa"},"content":{"rendered":"\n<p><strong>Estado Portuguesa.-<\/strong> Con el prop\u00f3sito de optimizar el servicio brindado a m\u00e1s de 267 mil habitantes, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), efectu\u00f3 labores de mantenimiento preventivo en las subestaciones Guanare, Acarigua I y II del estado Portuguesa.<\/p>\n\n\n\n<p>El mantenimiento, coordinado por la Gerencia de Transmisi\u00f3n, contempl\u00f3 la sustituci\u00f3n de componentes, mediciones, ajustes, lubricaci\u00f3n de partes m\u00f3viles, pruebas t\u00e9cnicas y conexiones, a fin de garantizar la operatividad de los equipos de potencias en estas instalaciones.<\/p>\n\n\n\n<p>Estas labores contempladas en el Plan Anual de Mantenimiento, robustece el transporte del fluido de energ\u00eda en la entidad y a su vez brinda mayor confiabilidad al Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de Corpoelec, se mantiene activo en el cumplimiento de las estrategias de trabajo establecidas para asegurar el suministro de energ\u00eda a los hogares venezolanos.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Portuguesa.- Con el prop\u00f3sito de optimizar el servicio brindado a m\u00e1s de 267 mil habitantes, la clase trabajadora de<\/p>\n","protected":false},"author":24,"featured_media":95506,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2725,2744,46],"class_list":["post-95505","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-portuguesa","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95505","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95505"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95505\/revisions"}],"predecessor-version":[{"id":95507,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95505\/revisions\/95507"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95506"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95505"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95505"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95505"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}