{"id":95763,"date":"2025-03-25T18:15:16","date_gmt":"2025-03-25T18:15:16","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95763"},"modified":"2025-03-25T18:15:18","modified_gmt":"2025-03-25T18:15:18","slug":"corpoelec-realizo-mantenimientos-preventivos-en-el-patio-de-distribucion-macagua-ii","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95763","title":{"rendered":"Corpoelec realiz\u00f3 mantenimientos preventivos en el Patio de Distribuci\u00f3n Macagua II"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.- <\/strong>La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) llev\u00f3 a cabo labores preventivas, para garantizar el buen funcionamiento del Autotransformador N1 -AT1- del Patio de Distribuci\u00f3n Macagua II.<\/p>\n\n\n\n<p>El personal de Corpoelec, ejecut\u00f3 continuas pruebas el\u00e9ctricas y funcionales, as\u00ed como la verificaci\u00f3n de aceites, proceso vital, para este equipo con capacidad de 300 megavoltiamperio (MVA).<\/p>\n\n\n\n<p>Nelson Acosta, trabajador de la Gerencia de Transmisi\u00f3n Bol\u00edvar y jefe encargado del Patio de Distribuci\u00f3n, resalt\u00f3 que \u201cestos equipos alimentan de energ\u00eda a siete subestaciones, con niveles de tensi\u00f3n a 115 kV, para beneficiar a toda Ciudad Guayana y a una parte de Upata\u201d.<\/p>\n\n\n\n<p>Esta red interconectada es fundamental para el Sistema de Transmisi\u00f3n Troncal de Corpoelec, ya que desde este Patio de Distribuci\u00f3n a 400 kV, tambi\u00e9n se abastece de energ\u00eda el\u00e9ctrica a las poblaciones del sur del estado Bol\u00edvar.<\/p>\n\n\n\n<p>Corpoelec trabaja permanentemente, para fortalecer el servicio en la regi\u00f3n, a fin de brindar bienestar y progreso a toda la poblaci\u00f3n bolivarense.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) llev\u00f3 a cabo labores preventivas, para garantizar el buen<\/p>\n","protected":false},"author":24,"featured_media":95764,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2723,2691,2704,11,2744,46],"class_list":["post-95763","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-bolivar","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95763","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95763"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95763\/revisions"}],"predecessor-version":[{"id":95765,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95763\/revisions\/95765"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95764"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95763"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95763"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95763"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}