{"id":95833,"date":"2025-03-27T16:18:36","date_gmt":"2025-03-27T16:18:36","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95833"},"modified":"2025-03-27T16:18:38","modified_gmt":"2025-03-27T16:18:38","slug":"fortalecen-el-sistema-electrico-en-la-guaira-con-mantenimiento-preventivo-en-la-subestacion-tacoa","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95833","title":{"rendered":"Fortalecen el sistema el\u00e9ctrico en La Guaira con mantenimiento preventivo en la subestaci\u00f3n Tacoa"},"content":{"rendered":"\n<p><strong>Estado La Guaira.- <\/strong>La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecutaron labores de mantenimiento en la Subestaci\u00f3n Tacoa 230 kV, para garantizar confiabilidad al sistema de transmisi\u00f3n de energ\u00eda en el estado La Guaira.<\/p>\n\n\n\n<p>Las maniobras t\u00e9cnicas y operativas a cargo de las cuadrillas, enmarcadas en el Plan Anual de Mantenimiento, que consistieron en la sustituci\u00f3n de tres aisladores de cadena, tres pararrayos y componentes el\u00e9ctricos a la l\u00ednea 2 Arrecifes-Tacoa.<\/p>\n\n\n\n<p>De igual manera, se llevaron a cabo la revisi\u00f3n, lubricaci\u00f3n y ajustes a los componentes el\u00e9ctricos, para alargar la vida \u00fatil de la instalaci\u00f3n el\u00e9ctrica.<\/p>\n\n\n\n<p>Con esta acci\u00f3n planificada, Corpoelec optimiza la operatividad de la subestaci\u00f3n Tacoa 230 kV, contribuyendo a la prestaci\u00f3n de un servicio estable y eficiente en la entidad guaire\u00f1a.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado La Guaira.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), ejecutaron labores de mantenimiento en la Subestaci\u00f3n Tacoa<\/p>\n","protected":false},"author":24,"featured_media":95834,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2743,11,2744,46],"class_list":["post-95833","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-la-guaira","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95833"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95833\/revisions"}],"predecessor-version":[{"id":95835,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95833\/revisions\/95835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95834"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}