{"id":95853,"date":"2025-03-28T13:46:33","date_gmt":"2025-03-28T13:46:33","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95853"},"modified":"2025-03-28T13:46:35","modified_gmt":"2025-03-28T13:46:35","slug":"corpoelec-adecua-mas-de-40-mil-metros-de-lineas-de-distribucion-en-barinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95853","title":{"rendered":"Corpoelec adecua m\u00e1s de 40 mil metros de l\u00edneas de distribuci\u00f3n en Barinas\u00a0"},"content":{"rendered":"\n<p><strong>Estado Barinas.-&nbsp;<\/strong>Como parte de las maniobras de mantenimiento preventivo que lleva adelante la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) en el estado Barinas, la clase trabajadora ha favorecido a m\u00e1s de 500 mil usuarios con labores de pica y poda, que permitieron adecuar 40 mil 650 metros de l\u00edneas en media y baja tensi\u00f3n.<\/p>\n\n\n\n<p>Las jornadas preventivas ejecutadas durante el primer trimestre del a\u00f1o, mejoran el rendimiento de 60 circuitos el\u00e9ctricos de los municipios Antonio Jos\u00e9 de Sucre, Alberto Arvelo Torrealba, Barinas, Bol\u00edvar, Cruz Paredes, Ezequiel Zamora, Obispos, Pedraza, Rojas y Sosa.&nbsp;<\/p>\n\n\n\n<p>Estas labores cumplidas por el personal de las gerencias de Programaci\u00f3n y Control de Vegetaci\u00f3n y Distribuci\u00f3n, aseguran el traslado de la energ\u00eda en los distintos sectores de la entidad llanera.&nbsp;<\/p>\n\n\n\n<p>Con estas acciones, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y Corpoelec, garantizan las condiciones \u00f3ptimas y aseguran el funcionamiento de los espacios del Sistema El\u00e9ctrico Nacional (SEN).&nbsp;<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-&nbsp;Como parte de las maniobras de mantenimiento preventivo que lleva adelante la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec) en el estado<\/p>\n","protected":false},"author":24,"featured_media":95854,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2698,2691,11,2947,2744,46],"class_list":["post-95853","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-barinas","tag-corpoelec","tag-mppee","tag-plan-pica-y-poda","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95853","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95853"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95853\/revisions"}],"predecessor-version":[{"id":95855,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95853\/revisions\/95855"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95854"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}