{"id":95920,"date":"2025-03-29T22:51:11","date_gmt":"2025-03-29T22:51:11","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95920"},"modified":"2025-03-29T22:51:13","modified_gmt":"2025-03-29T22:51:13","slug":"ministro-inspecciona-avances-de-subestacion-biscucuy","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95920","title":{"rendered":"Ministro inspecciona avances de subestaci\u00f3n Biscucuy"},"content":{"rendered":"\n<p><strong>Municipio Sucre, Estado Portuguesa.- <\/strong>En los esfuerzos destinados a fortalecer el Sistema El\u00e9ctrico Nacional (SEN), el ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, inspeccion\u00f3 las labores de construcci\u00f3n de la subestaci\u00f3n Biscucuy a 115 kV, ubicada en el estado Portuguesa.<\/p>\n\n\n\n<p>Esta obra que impactar\u00e1 directamente a usuarios de los municipios Sucre y Unda, es ejecutada por mano de obra 100% venezolana a trav\u00e9s de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec).<\/p>\n\n\n\n<p>A prop\u00f3sito de la pr\u00f3xima puesta en marcha de la subestaci\u00f3n Biscucuy a 115 kV, equipos especializados realizan peri\u00f3dicamente jornadas de mantenimiento preventivo a fin de garantizar las condiciones necesarias para el traslado de energ\u00eda el\u00e9ctrica.<\/p>\n\n\n\n<p>Estas acciones responden a instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, para garantizar un suministro continuo y de calidad mediante la mejora progresiva de las infraestructuras el\u00e9ctricas del pa\u00eds.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Municipio Sucre, Estado Portuguesa.- En los esfuerzos destinados a fortalecer el Sistema El\u00e9ctrico Nacional (SEN), el ministro del Poder Popular<\/p>\n","protected":false},"author":24,"featured_media":95921,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[2691,11,2725,2744,46],"class_list":["post-95920","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales","tag-corpoelec","tag-mppee","tag-portuguesa","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95920","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95920"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95920\/revisions"}],"predecessor-version":[{"id":95922,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95920\/revisions\/95922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95921"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95920"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95920"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95920"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}