{"id":95987,"date":"2025-04-02T15:08:08","date_gmt":"2025-04-02T15:08:08","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=95987"},"modified":"2025-04-02T15:08:10","modified_gmt":"2025-04-02T15:08:10","slug":"corpoelec-atendio-1-868-reportes-a-traves-de-la-linea-venapp-en-miranda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=95987","title":{"rendered":"Corpoelec atendi\u00f3 1.868 reportes a trav\u00e9s de la l\u00ednea VenApp en Miranda"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> Durante el mes de marzo, trabajadores y trabajadoras de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), atendieron 1.868 casos reportados por los usuarios y usuarias a trav\u00e9s de la L\u00ednea VenApp del 1&#215;10 del Buen Gobierno, en el estado Miranda.<\/p>\n\n\n\n<p>Las solicitudes en materia de energ\u00eda el\u00e9ctrica con mayor incidencia, fueron la sustituci\u00f3n e instalaci\u00f3n de transformadores de diferentes KVA, as\u00ed como tambi\u00e9n la instalaci\u00f3n de luminarias LED en espacios p\u00fablicos y de medidores.<\/p>\n\n\n\n<p>De igual manera, se dio respuesta oportuna a reportes de aver\u00edas, con el prop\u00f3sito de garantizar un servicio el\u00e9ctrico confiable en los ejes de Barlovento, Los Valles del Tuy, Los Altos Mirandinos, Metropolitano y Guarenas-Guatire.<\/p>\n\n\n\n<p>Corpoelec contin\u00faa fortaleciendo y cumpliendo las estrategias instruidas por el Ministerio del Poder Popular la Energ\u00eda El\u00e9ctrica (MPPEE), con la finalidad de garantizar la atenci\u00f3n oportuna y eficaz a la entidad mirandina.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Durante el mes de marzo, trabajadores y trabajadoras de la Corporaci\u00f3n El\u00e9ctrica Nacional (Corpoelec), atendieron 1.868 casos reportados<\/p>\n","protected":false},"author":24,"featured_media":95988,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2688,2691,2969,2709,11,2744,46],"class_list":["post-95987","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-1x10-del-buen-gobierno","tag-corpoelec","tag-linea-venapp","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95987","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=95987"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95987\/revisions"}],"predecessor-version":[{"id":95989,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/95987\/revisions\/95989"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/95988"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=95987"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=95987"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=95987"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}