{"id":96006,"date":"2025-04-03T13:12:12","date_gmt":"2025-04-03T13:12:12","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96006"},"modified":"2025-04-03T13:43:08","modified_gmt":"2025-04-03T13:43:08","slug":"mas-de-31-mil-tachirenses-se-favorecen-con-mantenimiento-a-subestacion-la-pedrera","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96006","title":{"rendered":"M\u00e1s de 31 mil tachirenses se favorecen con mantenimiento a subestaci\u00f3n La Pedrera"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> En el estado T\u00e1chira, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendi\u00f3 la subestaci\u00f3n el\u00e9ctrica La Pedrera con labores de mantenimiento integral, optimizando la prestaci\u00f3n del servicio a m\u00e1s de 31 mil usuarios en la zona sur del estado andino.<\/p>\n\n\n\n<p>Las maniobras t\u00e9cnicas efectuadas por el Grupo de Subestaciones, contemplaron la correcci\u00f3n de un punto caliente en la salida del transformador hacia la barra 13,8 kV, tambi\u00e9n realizaron el cambio de seccionador en el p\u00f3rtico de 34,5 kV, que enlaza los equipos entre El Cant\u00f3n y La pedrera.<\/p>\n\n\n\n<p>De igual manera, las cuadrillas de CORPOELEC efectuaron pruebas el\u00e9ctricas a los reconectadores de los circuitos La Pedrera y Abejales, siendo estas positivas, para abrir los elementos en los valores establecidos, con el fin de repotenciar los insumos que distribuyen la electricidad a los habitantes del municipio Libertador.<\/p>\n\n\n\n<p>Estas acciones, dan cumplimiento al Plan Nacional de Mantenimiento y Adecuaciones de Subestaciones, que la Corporaci\u00f3n ha venido desarrollando, con miras a ratificar su compromiso de promover los planes estrat\u00e9gicos que contribuyan a la prestaci\u00f3n confiable del servicio.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- En el estado T\u00e1chira, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendi\u00f3 la subestaci\u00f3n el\u00e9ctrica La Pedrera con labores de<\/p>\n","protected":false},"author":24,"featured_media":96007,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,11,2744,2700,46],"class_list":["post-96006","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96006","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96006"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96006\/revisions"}],"predecessor-version":[{"id":96010,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96006\/revisions\/96010"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96007"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96006"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96006"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96006"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}