{"id":96100,"date":"2025-04-07T16:56:13","date_gmt":"2025-04-07T16:56:13","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96100"},"modified":"2025-04-07T16:56:15","modified_gmt":"2025-04-07T16:56:15","slug":"mantenimiento-en-subestacion-tinaquillo-optimiza-servicio-a-mas-de-135-mil-cojedenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96100","title":{"rendered":"Mantenimiento en subestaci\u00f3n Tinaquillo optimiza servicio a m\u00e1s de 135 mil cojede\u00f1os"},"content":{"rendered":"\n<p><strong>Estado Cojedes.- <\/strong>En aras de continuar fortaleciendo el Sistema El\u00e9ctrico Nacional (SEN), el personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 mantenimiento preventivo y correctivo en la subestaci\u00f3n Tinaquillo 115 kV, en atenci\u00f3n a m\u00e1s de 135 mil usuarios cojede\u00f1os.<\/p>\n\n\n\n<p>Las maniobras consistieron en la puesta en servicio del banco de compensadores #02 en la barra #02 de 13.8kV, para compensar el factor de potencia y mejorar los perfiles de tensi\u00f3n, lo que aporta 06 MVA al SEN.<\/p>\n\n\n\n<p>Estas labores realizadas a trav\u00e9s de la Gerencia de Transmisi\u00f3n, permiten fortalecer la infraestructura y el suministro de energ\u00eda a los habitantes de los municipios Tinaquillo y Lima Blanco.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) y CORPOELEC, contin\u00faan trabajando en el acondicionamiento del SEN con obras que garantizan el desarrollo eficaz de las actividades diarias del sector.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Cojedes.- En aras de continuar fortaleciendo el Sistema El\u00e9ctrico Nacional (SEN), el personal de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC),<\/p>\n","protected":false},"author":24,"featured_media":96101,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2710,2691,2704,11,2744,46],"class_list":["post-96100","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-cojedes","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96100","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96100"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96100\/revisions"}],"predecessor-version":[{"id":96102,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96100\/revisions\/96102"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96101"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96100"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96100"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96100"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}