{"id":96263,"date":"2025-04-14T14:49:51","date_gmt":"2025-04-14T14:49:51","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96263"},"modified":"2025-04-14T14:49:53","modified_gmt":"2025-04-14T14:49:53","slug":"instalacion-de-transformadores-garantiza-servicio-en-comunidades-zulianas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96263","title":{"rendered":"Instalaci\u00f3n de transformadores garantiza servicio en comunidades zulianas"},"content":{"rendered":"\n<p><strong>Estado Zulia.-<\/strong> Trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), garantizan la continuidad del servicio con la instalaci\u00f3n de transformadores, beneficiando de manera directa a m\u00e1s 160 habitantes de las diferentes comunidades del municipio Guajira del estado Zulia.<\/p>\n\n\n\n<p>Las labores iniciaron con la instalaci\u00f3n de un transformador de 25kVA en el sector \u00c1ngel David, donde se atendieron a 14 familias, mientras que, en la parroquia Paraguaipoa en el sector Macucutao, se beneficiaron a 12 familias con la instalaci\u00f3n de equipo de distribuci\u00f3n de energ\u00eda de capacidad de 15kVA.<\/p>\n\n\n\n<p>Asimismo, cuadrillas de la estatal el\u00e9ctrica en la regi\u00f3n atendieron a los habitantes de la parroquia Sinamaica de la comunidad Matapalo.<\/p>\n\n\n\n<p>Con la sustituci\u00f3n de estos equipos el\u00e9ctricos, se mejora la distribuci\u00f3n de la energ\u00eda el\u00e9ctrica y brinda bienestar a las comunidades en el estado Zulia.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- Trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), garantizan la continuidad del servicio con la instalaci\u00f3n de transformadores, beneficiando<\/p>\n","protected":false},"author":24,"featured_media":96264,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2744,2751,46,2694],"class_list":["post-96263","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-transformadores","tag-venezuela","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96263","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96263"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96263\/revisions"}],"predecessor-version":[{"id":96265,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96263\/revisions\/96265"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96264"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96263"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96263"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96263"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}