{"id":96513,"date":"2025-04-25T19:06:04","date_gmt":"2025-04-25T19:06:04","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96513"},"modified":"2025-04-25T19:06:06","modified_gmt":"2025-04-25T19:06:06","slug":"corpoelec-mejora-confiabilidad-del-servicio-en-subestaciones-electricas-zulianas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96513","title":{"rendered":"CORPOELEC mejora confiabilidad del servicio en subestaciones el\u00e9ctricas zulianas"},"content":{"rendered":"\n<p><strong>Estado Zulia.- <\/strong>Con la finalidad de brindar mayor confiabilidad a las subestaciones el\u00e9ctricas Tablazo, El Rinc\u00f3n, Concepci\u00f3n, Soler y Bachaquero, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) activ\u00f3 cinco autotransformadores en las instalaciones.<\/p>\n\n\n\n<p>Estos equipos de potencia recibieron mantenimiento que contempl\u00f3 revisi\u00f3n, pruebas y rehabilitaci\u00f3n integral, en aras de garantizar al pueblo zuliano la continuidad del servicio a trav\u00e9s de los circuitos de distribuci\u00f3n.<\/p>\n\n\n\n<p>De igual manera, se ejecutaron trabajos de correcci\u00f3n a interruptores, revisi\u00f3n al cuarto control y equipos de protecci\u00f3n de estas subestaciones, ubicadas en los municipios, Maracaibo, San Francisco, Jes\u00fas Enrique Lossada, Cabimas y Miranda, respectivamente, labor que garantiza el \u00f3ptimo funcionamiento de estos equipos de transmisi\u00f3n de energ\u00eda.<\/p>\n\n\n\n<p>Los planes de mantenimiento a los equipos en las instalaciones el\u00e9ctricas corresponden a las acciones que impulsa el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, en aras de robustecer el sistema el\u00e9ctrico en la regi\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Zulia.- Con la finalidad de brindar mayor confiabilidad a las subestaciones el\u00e9ctricas Tablazo, El Rinc\u00f3n, Concepci\u00f3n, Soler y Bachaquero,<\/p>\n","protected":false},"author":24,"featured_media":96514,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2996,2691,11,2744,46,2694],"class_list":["post-96513","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-autotransformadores","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela","tag-zulia"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96513","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96513"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96513\/revisions"}],"predecessor-version":[{"id":96515,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96513\/revisions\/96515"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96514"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96513"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96513"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96513"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}