{"id":96680,"date":"2025-05-02T13:34:42","date_gmt":"2025-05-02T13:34:42","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96680"},"modified":"2025-05-02T13:34:45","modified_gmt":"2025-05-02T13:34:45","slug":"corpoelec-garantiza-operatividad-de-las-subestaciones-en-merida","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96680","title":{"rendered":"CORPOELEC garantiza operatividad de las subestaciones en M\u00e9rida"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), mantiene un plan de mantenimiento preventivo con las cuadrillas adscritas a la Gerencia Estadal de Programaci\u00f3n y Control de Vegetaci\u00f3n, para mantener libre de maleza y arbustos los espacios dentro y fuera de las instalaciones del Sistema El\u00e9ctrico Nacional (SEN) en M\u00e9rida.<\/p>\n\n\n\n<p>En este sentido, se realiz\u00f3 una jornada especial en las subestaciones Arapuey y San Antonio de 34,5\/13,8 KV, ubicadas en el municipio Julio C\u00e9sar Salas, en el eje Panamericano de la entidad andina.<\/p>\n\n\n\n<p>Las labores consistieron en el desmalezamiento mec\u00e1nico en los patios y cortafuego de las subestaciones, con el prop\u00f3sito de evitar el crecimiento de la vegetaci\u00f3n que pudiera afectar el buen funcionamiento de los equipos de potencia, como los transformadores y p\u00f3rticos de salida a nivel de alta tensi\u00f3n.<\/p>\n\n\n\n<p>Estas acciones forman parte del Plan Operativo Anual de la estatal el\u00e9ctrica en el territorio nacional, para garantizar la operatividad del SEN y fortalecer los procesos de transmisi\u00f3n y distribuci\u00f3n en favor de las comunidades.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), mantiene un plan de mantenimiento preventivo con las cuadrillas adscritas a la Gerencia<\/p>\n","protected":false},"author":24,"featured_media":96681,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2742,11,2744,46],"class_list":["post-96680","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-merida","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96680","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96680"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96680\/revisions"}],"predecessor-version":[{"id":96682,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96680\/revisions\/96682"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96681"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96680"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96680"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96680"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}