{"id":96743,"date":"2025-05-05T13:48:49","date_gmt":"2025-05-05T13:48:49","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96743"},"modified":"2025-05-05T16:41:56","modified_gmt":"2025-05-05T16:41:56","slug":"aplican-plan-pico-y-poda-en-municipios-carabobenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96743","title":{"rendered":"Aplican Plan Pica y Poda en municipios carabobe\u00f1os"},"content":{"rendered":"\n<p><strong>Estado Carabobo.-<\/strong>\u00a0 En aras de garantizar los sistemas de distribuci\u00f3n el\u00e9ctrica en los municipios Montalb\u00e1n y Miranda del estado Carabobo, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) adscrita a la Gerencia de Planificaci\u00f3n y Control de Vegetaci\u00f3n (PCV) llev\u00f3 a cabo una jornada especial del Plan Pica y Poda.<\/p>\n\n\n\n<p>Este manejo de vegetaci\u00f3n en la red de media tensi\u00f3n del circuito Sabaneta 34.5 kV, benefici\u00f3 a m\u00e1s de 10 mil 500 familias carabobe\u00f1as.<\/p>\n\n\n\n<p>Las labores incluyeron la poda de 2.8 kil\u00f3metros de maleza de las l\u00edneas el\u00e9ctricas, donde se efectuaron trabajos de corte selectivo en m\u00e1s de 50 puntos cr\u00edticos a lo largo del circuito Sabaneta.<\/p>\n\n\n\n<p>Estas acciones preventivas, en el manejo de la vegetaci\u00f3n se refiere al control y la eliminaci\u00f3n de la vegetaci\u00f3n no deseada, que entran en contacto con las l\u00edneas de tensi\u00f3n.&nbsp;<\/p>\n\n\n\n<p>Al respecto, Miguel Bencomo, jefe del Centro de Servicio, explic\u00f3 que las labores contempladas en el Plan Nacional de Pica y Poda, garantiza la continuidad y calidad del suministro el\u00e9ctrico en la zona.<\/p>\n\n\n\n<p>La estatal el\u00e9ctrica, siguiendo instrucciones del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), garantiza el suministro eficiente del servicio el\u00e9ctrico a la poblaci\u00f3n venezolana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Carabobo.-\u00a0 En aras de garantizar los sistemas de distribuci\u00f3n el\u00e9ctrica en los municipios Montalb\u00e1n y Miranda del estado Carabobo,<\/p>\n","protected":false},"author":24,"featured_media":96746,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2692,2691,11,3010,2744,46],"class_list":["post-96743","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-carabobo","tag-corpoelec","tag-mppee","tag-plan-pico-y-poda","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96743","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96743"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96743\/revisions"}],"predecessor-version":[{"id":96756,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96743\/revisions\/96756"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96746"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}