{"id":96791,"date":"2025-05-06T16:05:46","date_gmt":"2025-05-06T16:05:46","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96791"},"modified":"2025-05-06T16:05:47","modified_gmt":"2025-05-06T16:05:47","slug":"corpoelec-instala-transformadores-en-comunidades-meridenas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96791","title":{"rendered":"CORPOELEC instala transformadores en comunidades meride\u00f1as"},"content":{"rendered":"\n<p><strong>Estado M\u00e9rida.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendiendo las solicitudes del Poder Popular a trav\u00e9s de la plataforma VenApp, as\u00ed como las asignaciones de los proyectos favorecidos en las Consultas Populares 2025, efectu\u00f3 la instalaci\u00f3n de 11 transformadores de distribuci\u00f3n en diez comunidades del estado M\u00e9rida.<\/p>\n\n\n\n<p>Las cuadrillas adscritas a los Centros de Servicios en los ejes territoriales del P\u00e1ramo, Panamericano y Metropolitano, se desplegaron mediante operativos de mantenimiento correctivo en las redes de distribuci\u00f3n, para lograr la instalaci\u00f3n de transformadores con niveles de voltaje de 25; 37,5; 50 y 75 kVA.<\/p>\n\n\n\n<p>Las comunidades beneficiadas, ubicadas en los municipios Miranda fueron Pueblo Llano; Alberto Adriani; Obispo Ramos de Lora; Libertador; Sucre y Campo El\u00edas, se encuentran La Vega de Timotes, La Venta, Santa Eduvigis, El Taparo, 12 de Octubre, Maisanta Murach\u00ed, Ca\u00f1o Moro, Humberto Tejera, Mucumb\u00fa Alto y El Portachuelo.<\/p>\n\n\n\n<p>Esta instalaci\u00f3n en la entidad andina, se materializa gracias a las pol\u00edticas del Gobierno Bolivariano del Presidente Nicol\u00e1s Maduro, a trav\u00e9s de la plataforma VenApp y la asignaci\u00f3n de proyectos favorecidos en las Consultas Populares 2025.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado M\u00e9rida.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendiendo las solicitudes del Poder Popular a trav\u00e9s de la plataforma VenApp, as\u00ed<\/p>\n","protected":false},"author":24,"featured_media":96792,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2742,11,2744,2751,46],"class_list":["post-96791","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-merida","tag-mppee","tag-sen","tag-transformadores","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96791","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96791"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96791\/revisions"}],"predecessor-version":[{"id":96793,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96791\/revisions\/96793"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96792"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96791"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96791"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96791"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}