{"id":96826,"date":"2025-05-07T16:46:59","date_gmt":"2025-05-07T16:46:59","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96826"},"modified":"2025-05-07T16:47:02","modified_gmt":"2025-05-07T16:47:02","slug":"ejecutan-mantenimiento-correctivo-a-red-electrica-subterranea-en-miranda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96826","title":{"rendered":"Ejecutan mantenimiento correctivo a red el\u00e9ctrica subterr\u00e1nea en Miranda"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectuaron un mantenimiento correctivo en conexiones de los conductores subterr\u00e1neos en media tensi\u00f3n, ubicados en la avenida Bicentenaria de Los Teques, municipio Guaicaipuro del estado Miranda.<\/p>\n\n\n\n<p>El personal operativo sustituy\u00f3 120 metros de conductores, constituidos por cables PLT750 de aluminio, para dar continuidad a la carga el\u00e9ctrica del circuito Barbecho B6, asociado a la subestaci\u00f3n Barbecho, para garantizar la distribuci\u00f3n del servicio el\u00e9ctrico a m\u00e1s de 8.000 familias del municipio Guaicaipuro.<\/p>\n\n\n\n<p>Entre las zonas beneficiadas se encuentran las avenidas Bicentenaria, Al\u00ed Primera, Pedro Russo Ferrer, Jorge Losch, calles Santa Mar\u00eda, la Francesa, Los Pinos, Matica Abajo, Negro Primero y sus adyacencias.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectuaron un mantenimiento correctivo en conexiones de los conductores subterr\u00e1neos en<\/p>\n","protected":false},"author":24,"featured_media":96827,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2709,11,2744,46],"class_list":["post-96826","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96826","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96826"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96826\/revisions"}],"predecessor-version":[{"id":96828,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96826\/revisions\/96828"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96827"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96826"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96826"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96826"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}