{"id":96966,"date":"2025-05-12T19:49:58","date_gmt":"2025-05-12T19:49:58","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=96966"},"modified":"2025-05-12T20:12:58","modified_gmt":"2025-05-12T20:12:58","slug":"ministro-marquez-inspecciona-instalaciones-electricas-de-apure","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=96966","title":{"rendered":"Ministro M\u00e1rquez inspecciona instalaciones el\u00e9ctricas de Apure"},"content":{"rendered":"\n<p><strong>Estado Apure.-<\/strong> Como parte de las acciones que se ejecutan a trav\u00e9s del Plan Nacional de Inspecciones y Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN), el ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, inspeccion\u00f3 los trabajos de remodelaci\u00f3n que se realizan en la subestaci\u00f3n San Fernando I, ubicada en el municipio San Fernando del estado Apure.<\/p>\n\n\n\n<p>Acompa\u00f1ado del presidente de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), Jos\u00e9 Luis Betancourt, el titular de la cartera de Energ\u00eda El\u00e9ctrica constat\u00f3 los avances presentados en esta importante infraestructura del estado llanero que atiende a m\u00e1s de 200 mil usuarios y usuarias.<\/p>\n\n\n\n<p>En su recorrido por el estado apure\u00f1o, el tambi\u00e9n Vicepresidente Sectorial de Obras P\u00fablicas y Servicios, visit\u00f3 la subestaci\u00f3n San Fernando II, en aras de verificar los trabajos de mejora que se ejecutan en esta infraestructura.<\/p>\n\n\n\n<p>Esta instalaci\u00f3n favorece con un servicio \u00f3ptimo y de calidad a 191 mil habitantes de los municipios Biruaca, Pedro Camejo y Achaguas.<\/p>\n\n\n\n<p>Las labores de rehabilitaci\u00f3n de espacios en las instalaciones el\u00e9ctricas, tributan a garantizar el buen funcionamiento del SEN, dando cumplimiento a los lineamientos del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro Moros.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC \/ Joelin Jim\u00e9nez<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Apure.- Como parte de las acciones que se ejecutan a trav\u00e9s del Plan Nacional de Inspecciones y Mantenimiento Integral<\/p>\n","protected":false},"author":24,"featured_media":96967,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[2722,2691,2909,11,2744,46],"class_list":["post-96966","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales","tag-apure","tag-corpoelec","tag-inspeccion","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96966","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=96966"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96966\/revisions"}],"predecessor-version":[{"id":96971,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/96966\/revisions\/96971"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/96967"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=96966"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=96966"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=96966"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}