{"id":97054,"date":"2025-05-15T15:20:30","date_gmt":"2025-05-15T15:20:30","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97054"},"modified":"2025-05-15T17:07:38","modified_gmt":"2025-05-15T17:07:38","slug":"tachirenses-beneficiados-con-mantenimiento-integral-en-subestacion-siberia","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97054","title":{"rendered":"Tachirenses beneficiados con mantenimiento integral en subestaci\u00f3n Siberia"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 labores de mantenimiento integral en la subestaci\u00f3n Siberia, favoreciendo a 21 mil habitantes del municipio Uribante del estado T\u00e1chira.<\/p>\n\n\n\n<p>Durante las labores efectuadas por la Gerencia Estadal de Generaci\u00f3n, se realizaron pruebas de aislamiento al transformador de potencia de 1 MVA y se constat\u00f3 el buen funcionamiento de las bobinas dentro del equipo, con el prop\u00f3sito de garantizar el suministro el\u00e9ctrico a la poblaci\u00f3n de la zona de monta\u00f1a.<\/p>\n\n\n\n<p>Con estos trabajos, CORPOELEC optimiz\u00f3 la operatividad del circuito Siberia 34,5 kV, fortaleciendo la transmisi\u00f3n de energ\u00eda en los sectores Araguaney, La Onda, Santa Rosa, Pregonero, Siberia, Campamento La Trampa y Caparo del municipio Uribante.<\/p>\n\n\n\n<p>La Corporaci\u00f3n ejecuta estas maniobras de mantenimiento en la subestaci\u00f3n de manera constante, con el prop\u00f3sito de seguir mantener en buen estado los equipos y elementos el\u00e9ctricos de generan y distribuyen el servicio en la localidad.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 labores de mantenimiento integral en la subestaci\u00f3n Siberia,<\/p>\n","protected":false},"author":24,"featured_media":97055,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2744,2700,46],"class_list":["post-97054","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97054","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97054"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97054\/revisions"}],"predecessor-version":[{"id":97056,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97054\/revisions\/97056"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97055"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97054"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97054"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97054"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}