{"id":97107,"date":"2025-05-17T15:24:36","date_gmt":"2025-05-17T15:24:36","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97107"},"modified":"2025-05-17T21:49:31","modified_gmt":"2025-05-17T21:49:31","slug":"atendida-red-electrica-subterranea-y-aerea-en-13-sectores-de-altos-mirandinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97107","title":{"rendered":"Atendida red el\u00e9ctrica subterr\u00e1nea y a\u00e9rea en 13 sectores de Altos Mirandinos"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) atendi\u00f3 con mantenimientos correctivos, la red el\u00e9ctrica subterr\u00e1nea y a\u00e9rea de 13 sectores en Altos Mirandinos.\u00a0<\/p>\n\n\n\n<p>En el municipio Guaicaipuro, las cuadrillas sustituyeron dos transformadores con capacidad de 300 kVA y 25 kVA, lo que permiti\u00f3 el flujo el\u00e9ctrico a m\u00e1s de 800 usuarios y usuarias conectados a la red residencial y comercial.<\/p>\n\n\n\n<p>El cambio de estos equipos de potencia se realiz\u00f3 en el sector Los Panamericanos, a la altura del kil\u00f3metro 38 de la carretera Panamericana, y en la avenida Berm\u00fadez, calle Negro Primero.<\/p>\n\n\n\n<p>Las labores de mantenimiento en el municipio Los Salias se centraron en dos circuitos que forman parte de la Subestaci\u00f3n San Antonio. <\/p>\n\n\n\n<p>En esta red fueron sustituidos componentes y se coloc\u00f3 un nuevo cable PLT 750 de aluminio para mejorar el servicio a usuarios y usuarias residenciales, comerciales e industriales que forman parte de los sectores: Club de Campo, Potrero del Medio, La Guadalupe, La Fragua, Cierra Brava, urbanizaciones: Las Salias, Los Castores, La Arboleda, La Loma, El Topito y sus adyacencias.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-Corpoelec<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) atendi\u00f3 con mantenimientos correctivos, la red el\u00e9ctrica subterr\u00e1nea y a\u00e9rea de 13 sectores<\/p>\n","protected":false},"author":22,"featured_media":97108,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2744,46],"class_list":["post-97107","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97107","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97107"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97107\/revisions"}],"predecessor-version":[{"id":97118,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97107\/revisions\/97118"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97108"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97107"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97107"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97107"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}