{"id":97162,"date":"2025-05-20T15:19:01","date_gmt":"2025-05-20T15:19:01","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97162"},"modified":"2025-05-20T15:19:03","modified_gmt":"2025-05-20T15:19:03","slug":"atendidos-circuitos-electricos-mirandinos-con-plan-pica-y-poda","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97162","title":{"rendered":"Atendidos circuitos el\u00e9ctricos mirandinos con Plan Pica y Poda"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendi\u00f3 a trav\u00e9s del Plan Pica y Poda a 31 circuitos el\u00e9ctricos de distribuci\u00f3n, para fortalecer la prestaci\u00f3n de servicio el\u00e9ctrico ofrecido a los usuarios de la entidad.<\/p>\n\n\n\n<p>Los trabajos se enfocaron en la remoci\u00f3n de vegetaci\u00f3n cercana al tendido el\u00e9ctrico a lo largo de 349 km de l\u00edneas en baja, media y alta tensi\u00f3n, asociadas a 29 subestaciones el\u00e9ctricas en los ejes Barlovento, Guarenas-Guatire-Caucagua, Altos Mirandinos y Valles del Tuy.<\/p>\n\n\n\n<p>En otras acciones, las cuadrillas operativas desarrollaron estrategias preventivas con el desmalezamiento y limpieza de todas las \u00e1reas internas, externas y \u00e1reas de cortafuegos en ocho subestaciones de distribuci\u00f3n, proyectando un avance de 6.629 metros cuadrados desmalezados.<\/p>\n\n\n\n<p>Todas estas medidas obedecen al plan de mantenimiento preventivo en instalaciones y redes el\u00e9ctricas para fortalecer el Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendi\u00f3 a trav\u00e9s del Plan Pica y Poda a<\/p>\n","protected":false},"author":24,"featured_media":97164,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2947,2744,46],"class_list":["post-97162","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-plan-pica-y-poda","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97162","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97162"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97162\/revisions"}],"predecessor-version":[{"id":97165,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97162\/revisions\/97165"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97164"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97162"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97162"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97162"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}