{"id":97189,"date":"2025-05-21T14:26:30","date_gmt":"2025-05-21T14:26:30","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97189"},"modified":"2025-05-21T14:27:39","modified_gmt":"2025-05-21T14:27:39","slug":"ejecutan-mantenimiento-preventivo-en-lineas-de-transmision-tachirenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97189","title":{"rendered":"Ejecutan mantenimiento preventivo en l\u00edneas de transmisi\u00f3n tachirenses"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendi\u00f3 a subestaciones, circuitos\u00a0 y corredores el\u00e9ctricos de la entidad andina a trav\u00e9s del con el Plan de Mantenimiento Preventivo, con el prop\u00f3sito de continuar mejorando el servicio en los\u00a0 diversos municipios del estado T\u00e1chira.<\/p>\n\n\n\n<p>Entre las labores realizadas se atendieron las subestaciones El Corozo, Las Cuevas, San Pedro 13.8kVA y la Planta de Generaci\u00f3n Termoel\u00e9ctrica La Fr\u00eda, con desmalezamiento manual y control qu\u00edmico, incluyendo los circuitos Abejales, Campamento La Vuetosa 13.8 y 34.5 kVA, Pregonero y el Valle con despeje por emergencia.<\/p>\n\n\n\n<p>Igualmente, se efectuaron labores de mantenimiento mec\u00e1nico con poda en los corredores de servicios 230Kva, El Corozo-Uribante Uribante-Vigia II, La Vueltosa- Guasdualito, Uribante-La Pedrera, San Crist\u00f3bal-La Grita, La Fr\u00eda Il-San Antonio y Planta T\u00e1chira-Terna l y II, con el fin de solucionar, restaurar y asegurar el funcionamiento de los circuitos en las redes el\u00e9ctricas ocasionadas por el contacto de ramas en las l\u00edneas de transmisi\u00f3n.<\/p>\n\n\n\n<p>CORPOELEC reitera su compromiso con el pueblo venezolano que trabaja continuamente, para garantizar la estabilidad del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), atendi\u00f3 a subestaciones, circuitos\u00a0 y corredores el\u00e9ctricos de la entidad andina a trav\u00e9s<\/p>\n","protected":false},"author":24,"featured_media":97191,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,11,2744,2700,46],"class_list":["post-97189","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97189","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97189"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97189\/revisions"}],"predecessor-version":[{"id":97190,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97189\/revisions\/97190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97191"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97189"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97189"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97189"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}