{"id":97309,"date":"2025-05-26T15:32:14","date_gmt":"2025-05-26T15:32:14","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97309"},"modified":"2025-05-26T15:32:16","modified_gmt":"2025-05-26T15:32:16","slug":"beneficiados-mas-de-150-mil-mirandinos-con-mantenimiento-a-subestaciones","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97309","title":{"rendered":"Beneficiados m\u00e1s de 150 mil mirandinos con mantenimiento a subestaciones"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectu\u00f3 mantenimiento integral en las subestaciones Diego Lozada\u00a0 400\/230\/115,\u00a0 Santa Teresa III 400\/230\/115\/34,5 y Ocumare II 115\/13.8 kV en beneficio a 158 mil 120 usuarios de los municipios Independencia, Tom\u00e1s Lander, Crist\u00f3bal Rojas\u00a0 y Rafael Urdaneta del estado Miranda.<\/p>\n\n\n\n<p>Los operarios llevaron a cabo una inspecci\u00f3n exhaustiva a los equipos de potencia, revisi\u00f3n y lubricaci\u00f3n de conexiones y elementos mec\u00e1nicos, limpieza de porcelanas, verificaci\u00f3n de los sistemas de protecci\u00f3n y control, ajuste de torniller\u00eda y borneras, para garantizar el \u00f3ptimo funcionamiento de la infraestructura el\u00e9ctrica.<\/p>\n\n\n\n<p>Igualmente, realizaron un mantenimiento en las copas terminales asociados al banco de condensadores N\u00b0 2, para asegurar la terminaci\u00f3n de un cable de alta tensi\u00f3n en el exterior, limpieza y adecuaci\u00f3n de bases, conexi\u00f3n de conductores de potencia de la celda D1820, barrido de armarios asociados al transformador 1, con el prop\u00f3sito de restaurar y fortalecer el sistema el\u00e9ctrico.<\/p>\n\n\n\n<p>Estas acciones reflejan el esfuerzo continuo de los hombres y mujeres del sector el\u00e9ctrico por garantizar un suministro de energ\u00eda confiable y de calidad para el pueblo.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) efectu\u00f3 mantenimiento integral en las subestaciones Diego Lozada\u00a0 400\/230\/115,\u00a0 Santa Teresa III 400\/230\/115\/34,5<\/p>\n","protected":false},"author":24,"featured_media":97310,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2744,46],"class_list":["post-97309","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97309"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97309\/revisions"}],"predecessor-version":[{"id":97311,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97309\/revisions\/97311"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97310"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}