{"id":97585,"date":"2025-06-05T16:34:59","date_gmt":"2025-06-05T16:34:59","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97585"},"modified":"2025-06-05T16:35:01","modified_gmt":"2025-06-05T16:35:01","slug":"atienden-circuitos-de-distribucion-para-favorecer-a-mas-de-350-mil-carabobenos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97585","title":{"rendered":"Atienden circuitos de distribuci\u00f3n para favorecer a m\u00e1s de 350 mil carabobe\u00f1os"},"content":{"rendered":"\n<p><strong>Estado Carabobo.-<\/strong> La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) favoreci\u00f3 a m\u00e1s de 350 mil usuarios del estado Carabobo, atendi\u00f3 a 25 circuitos de distribuci\u00f3n para brindar un servicio \u00f3ptimo a la poblaci\u00f3n carabobe\u00f1a.<\/p>\n\n\n\n<p>Entre los circuitos intervenidos se encuentran San Rafael (13.8 KV, 26,40 km), Sabaneta (34.5 KV, 2.80 km), Sabana Larga (13.8 KV, 1,40 km), Las Vueltas (13.8 KV, 4.96 km), y Sur VII (13.8 KV, 0.62 km), cubriendo una extensi\u00f3n de 132,73 kil\u00f3metros.<\/p>\n\n\n\n<p>Estas labores incluyeron la poda y control de vegetaci\u00f3n, as\u00ed como la revisi\u00f3n y mantenimiento de la infraestructura el\u00e9ctrica, atenci\u00f3n importante para prevenir fallas causadas por ramas ca\u00eddas o el contacto con l\u00edneas de transmisi\u00f3n.<\/p>\n\n\n\n<p>Las acciones de mantenimiento preventivo aseguran la operatividad de los circuitos, reducen los tiempos de respuesta ante eventuales fallas y mejoran la calidad del servicio el\u00e9ctrico en las comunidades.<\/p>\n\n\n\n<p>Este compromiso se traduce en una mayor confiabilidad para los usuarios y la continuidad de las actividades cotidianas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Carabobo.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) favoreci\u00f3 a m\u00e1s de 350 mil usuarios del estado Carabobo, atendi\u00f3 a 25<\/p>\n","protected":false},"author":24,"featured_media":97586,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2692,2691,11,2744,46],"class_list":["post-97585","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-carabobo","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97585"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97585\/revisions"}],"predecessor-version":[{"id":97587,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97585\/revisions\/97587"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97586"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}