{"id":97624,"date":"2025-06-06T17:42:18","date_gmt":"2025-06-06T17:42:18","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97624"},"modified":"2025-06-06T17:42:20","modified_gmt":"2025-06-06T17:42:20","slug":"robustecen-sistema-electrico-con-instalacion-de-transformador-en-bolivar","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97624","title":{"rendered":"Robustecen sistema el\u00e9ctrico con instalaci\u00f3n de transformador en Bol\u00edvar"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.- <\/strong>Como parte del Plan de Mantenimiento y Mejoras en las instalaciones el\u00e9ctricas que adelanta la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), se instal\u00f3 un transformador m\u00f3vil de 30 MVA en la subestaci\u00f3n Cayaurima 1 de 115\/13,8 kV, ubicada en la avenida Libertador, municipio Angostura del Orinoco.<\/p>\n\n\n\n<p>Las maniobras fueron efectuadas por un personal multidisciplinario de la estatal el\u00e9ctrica quienes, con m\u00edstica, dedicaci\u00f3n y compromiso, llevaron a cabo una ardua labor, que se centr\u00f3 en el traslado y ubicaci\u00f3n del transformador m\u00f3vil, as\u00ed como de la conexi\u00f3n a la barra II de 13.8 kV.<\/p>\n\n\n\n<p>Adicionalmente, se realizaron pruebas el\u00e9ctricas, que condujeron a la puesta en servicio del equipo de potencia.<\/p>\n\n\n\n<p>Simult\u00e1neamente, se ejecut\u00f3 la ampliaci\u00f3n de un circuito, instalando 300 metros de l\u00edneas y se colocaron luminarias LED en el Patio 115\/13.8 kV de la subestaci\u00f3n.<\/p>\n\n\n\n<p>Gracias a estas labores, se mejora el sistema el\u00e9ctrico de la entidad, para el beneficio de los habitantes de Aceiticos, Santa Fe I y II.<\/p>\n\n\n\n<p>La industria el\u00e9ctrica contin\u00faa ejecutando planes y proyectos que coadyuven a la prestaci\u00f3n y servicio el\u00e9ctrico seguro y confiable.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- Como parte del Plan de Mantenimiento y Mejoras en las instalaciones el\u00e9ctricas que adelanta la Corporaci\u00f3n El\u00e9ctrica Nacional<\/p>\n","protected":false},"author":24,"featured_media":97625,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2723,2691,11,2744,46],"class_list":["post-97624","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-bolivar","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97624","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97624"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97624\/revisions"}],"predecessor-version":[{"id":97626,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97624\/revisions\/97626"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97625"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97624"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97624"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97624"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}