{"id":97630,"date":"2025-06-07T13:50:17","date_gmt":"2025-06-07T13:50:17","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97630"},"modified":"2025-06-07T13:50:19","modified_gmt":"2025-06-07T13:50:19","slug":"corpoelec-fortalece-el-suministro-electrico-a-16-mil-tachirenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97630","title":{"rendered":"CORPOELEC fortalece el suministro el\u00e9ctrico a 16 mil tachirenses"},"content":{"rendered":"\n<p><strong>Estado T\u00e1chira.-<\/strong> Con el prop\u00f3sito de optimizar el servicio de energ\u00eda en T\u00e1chira, la clase obrera de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 labores de mantenimiento integral en la subestaci\u00f3n Bocon\u00f3, ubicada en el municipio Samuel Dar\u00edo Maldonado.<\/p>\n\n\n\n<p>Durante los trabajos, se realiz\u00f3 la instalaci\u00f3n de un reconectador sobre el circuito Bocon\u00f3 13,8 kV, adem\u00e1s de pruebas de inyecci\u00f3n de corriente, dejando totalmente operativo el circuito.<\/p>\n\n\n\n<p>De igual manera, se efectuaron pruebas a todos los equipos, constatando la operatividad y buen funcionamiento de los elementos el\u00e9ctricos que generan y distribuyen la energ\u00eda, para garantizar el servicio de electricidad a m\u00e1s de 16 mil usuarios tachirenses de la zona norte.<\/p>\n\n\n\n<p>El despliegue que la Corporaci\u00f3n realiza de manera constante, apunta a robustecer la estabilidad del servicio el\u00e9ctrico, en cumplimiento a los planes estrat\u00e9gicos para fortalecer el Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado T\u00e1chira.- Con el prop\u00f3sito de optimizar el servicio de energ\u00eda en T\u00e1chira, la clase obrera de la Corporaci\u00f3n El\u00e9ctrica<\/p>\n","protected":false},"author":24,"featured_media":97631,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,11,2744,2700,46],"class_list":["post-97630","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mppee","tag-sen","tag-tachira","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97630"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97630\/revisions"}],"predecessor-version":[{"id":97632,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97630\/revisions\/97632"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97631"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}