{"id":97652,"date":"2025-06-07T17:44:09","date_gmt":"2025-06-07T17:44:09","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97652"},"modified":"2025-06-07T17:44:11","modified_gmt":"2025-06-07T17:44:11","slug":"plan-pica-y-poda-favorece-a-mas-de-80-mil-anzoatiguenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97652","title":{"rendered":"Plan Pica y Poda favorece a m\u00e1s de 80 mil anzoatiguenses"},"content":{"rendered":"\n<p><strong>Puerto La Cruz, estado Anzo\u00e1tegui.- <\/strong>Para robustecer la operatividad de las instalaciones y redes, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) desarroll\u00f3 mantenimiento en las subestaciones ubicadas en la entidad oriental.<\/p>\n\n\n\n<p>Estas actividades, que se desarrollan de manera peri\u00f3dica, tambi\u00e9n abarcaron el desmalezamiento en las l\u00edneas en servicio, con el prop\u00f3sito de mitigar los efectos del crecimiento de la llamada contaminaci\u00f3n vegetal a consecuencia de la presencia del periodo de invierno.<\/p>\n\n\n\n<p>En este sentido, se han atendido 66.59 kil\u00f3metros abordados con el despeje de \u00e1rboles, para reducir la posibilidad de perturbaci\u00f3n en el sistema por esta causa beneficiando a m\u00e1s de 80 mil usuarios anzoatiguenses.<\/p>\n\n\n\n<p>Durante el mes de mayo se atendieron 17 circuitos el\u00e9ctricos en media tensi\u00f3n entre los cuales se encuentran Hospital, Base A\u00e9rea, Atapirire, Pasa, Clarines, Puente Real, Ojo de Agua, Picas del Neveri, Boqueticos, Centro de Guanta, Ca\u00f1o Salao, Hidrocaribe, Portugal I y II, Las Carmelitas y Pequ\u00edn asociados a las subestaciones Guaraguao, Para\u00edso, Chuparin, Barcelona, Cuartel, Tronconal, Barbacoa y Atapirire.<\/p>\n\n\n\n<p>Los trabajos ejecutados fortalecen el sistema el\u00e9ctrico en los municipios Sotillo, Guanta, Bol\u00edvar, Urbaneja, Bruzual, Miranda y Sim\u00f3n Rodr\u00edguez.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Puerto La Cruz, estado Anzo\u00e1tegui.- Para robustecer la operatividad de las instalaciones y redes, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) desarroll\u00f3<\/p>\n","protected":false},"author":24,"featured_media":97653,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2706,2691,11,2744,46],"class_list":["post-97652","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-anzoategui","tag-corpoelec","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97652","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97652"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97652\/revisions"}],"predecessor-version":[{"id":97654,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97652\/revisions\/97654"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97653"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97652"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97652"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97652"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}