{"id":97685,"date":"2025-06-09T19:00:33","date_gmt":"2025-06-09T19:00:33","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97685"},"modified":"2025-06-09T19:00:35","modified_gmt":"2025-06-09T19:00:35","slug":"corpoelec-optimiza-el-sistema-electrico-en-sectores-deltanos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97685","title":{"rendered":"CORPOELEC optimiza el sistema el\u00e9ctrico en sectores deltanos"},"content":{"rendered":"\n<p><strong>Estado Delta Amacuro.- <\/strong>En aras de robustecer el sistema de energ\u00eda el\u00e9ctrica, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), realiz\u00f3 labores de mantenimiento preventivo y correctivo en el estado Delta Amacuro.<\/p>\n\n\n\n<p>Los sectores Clavellina, San Jos\u00e9, Zamuro, Florida, Londres, El Sam\u00e1n, Las Manacas, Miraflores, Garceros entre otros, asociados al circuito La Horqueta, resultaron favorecidos con las maniobras de reajuste de puentes en el reconectador de la subestaci\u00f3n Manamo I.&nbsp;<\/p>\n\n\n\n<p>Durante la jornada, los operarios de la estatal el\u00e9ctrica sustituyeron puentes en las l\u00edneas de distribuci\u00f3n de los circuitos Los Fundadores y Centro de la Ciudad de Tucupita, al tiempo que instalaron un transformador en calle Las Flores del sector Deltaven III de la parroquia Leonardo Ruiz Pineda.<\/p>\n\n\n\n<p>Concepci\u00f3n Mej\u00edas, habitante de la zona, agradeci\u00f3 la \u201ceficiente labor realizada por los trabajadores de CORPOELEC y la acci\u00f3n oportuna de la instalaci\u00f3n de un transformador, el cual es un equipo indispensable para beneficiar a m\u00e1s de 121 habitantes de nuestra comunidad\u201d.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, ratifica el compromiso por ofrecer un sistema robusto y confiable para ofrecer un buen servicio para el buen vivir de la poblaci\u00f3n deltana.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Delta Amacuro.- En aras de robustecer el sistema de energ\u00eda el\u00e9ctrica, la clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional<\/p>\n","protected":false},"author":24,"featured_media":97686,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2761,11,2744,46],"class_list":["post-97685","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-delta-amacuro","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97685","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97685"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97685\/revisions"}],"predecessor-version":[{"id":97687,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97685\/revisions\/97687"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97686"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97685"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97685"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97685"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}