{"id":97757,"date":"2025-06-11T23:05:02","date_gmt":"2025-06-11T23:05:02","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97757"},"modified":"2025-06-11T23:05:04","modified_gmt":"2025-06-11T23:05:04","slug":"ministro-marquez-inspecciono-avances-de-la-subestacion-farallones-en-bolivar","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97757","title":{"rendered":"Ministro M\u00e1rquez inspeccion\u00f3 avances de la subestaci\u00f3n Farallones en Bol\u00edvar"},"content":{"rendered":"\n<p><strong>Estado Bol\u00edvar.-<\/strong> Dando continuidad al Plan Nacional de Inspecciones y Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN), este mi\u00e9rcoles el ministro del Poder Popular para la Energ\u00eda El\u00e9ctrica, Jorge M\u00e1rquez, inspeccion\u00f3 los avances de rehabilitaci\u00f3n en la subestaci\u00f3n Farallones, ubicada en la avenida Perimetral, Zona Industrial Fanatracto en del municipio Angostura del Orinoco, en Ciudad Bol\u00edvar.<\/p>\n\n\n\n<p>Durante un recorrido por las instalaciones, acompa\u00f1ado por el presidente de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), Jos\u00e9 Luis Betancourt, M\u00e1rquez, convers\u00f3 con la clase trabajadora del sector, en aras de constatar los sistemas y operatividad de esta infraestructura, as\u00ed como tambi\u00e9n afinar estrategias de trabajo que apunten al fortalecimiento del SEN.<\/p>\n\n\n\n<p>Esta subestaci\u00f3n cuenta con equipos de potencia, que permiten fortalecer el SEN y optimizar la prestaci\u00f3n del suministro de energ\u00eda el\u00e9ctrica a m\u00e1s de 8 mil familias bolivarenses.<\/p>\n\n\n\n<p>Siguiendo instrucciones del presidente de la Rep\u00fablica, Nicol\u00e1s Maduro Moros, el ministro M\u00e1rquez supervisa de forma continua las instalaciones de CORPOELEC en el territorio nacional, como parte del Plan de la Patria de las 7T, las Grandes Transformaciones rumbo al 2030, enfocado en la atenci\u00f3n de los servicios p\u00fablicos e infraestructura.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Bol\u00edvar.- Dando continuidad al Plan Nacional de Inspecciones y Mantenimiento Integral del Sistema El\u00e9ctrico Nacional (SEN), este mi\u00e9rcoles el<\/p>\n","protected":false},"author":24,"featured_media":97758,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[15],"tags":[2723,2691,11,2744,3051,46],"class_list":["post-97757","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nacionales","tag-bolivar","tag-corpoelec","tag-mppee","tag-sen","tag-subestacion-farallones","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97757","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97757"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97757\/revisions"}],"predecessor-version":[{"id":97759,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97757\/revisions\/97759"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97758"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}