{"id":97868,"date":"2025-06-16T14:28:18","date_gmt":"2025-06-16T14:28:18","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97868"},"modified":"2025-06-16T18:47:30","modified_gmt":"2025-06-16T18:47:30","slug":"mas-de-18-mil-mirandinos-beneficiados-con-mantenimiento-a-la-subestacion-sarao","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97868","title":{"rendered":"M\u00e1s de 18 mil mirandinos beneficiados con mantenimiento a la subestaci\u00f3n Sarao"},"content":{"rendered":"\n<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 labores de mantenimiento preventivo en la subestaci\u00f3n El Sarao, ubicada en el municipio Pedro Gual del estado Miranda, con el objetivo de fortalecer la distribuci\u00f3n de energ\u00eda en el eje Barlovento y ofrecer un servicio \u00f3ptimo a m\u00e1s de 18.500 usuarios.<\/p>\n\n\n\n<p>Los trabajos incluyeron la sustituci\u00f3n de barras en los p\u00f3rticos de 13,8 y 34,5 kV, el reemplazo de seccionadores de salidas de l\u00edneas y bypass, la correcci\u00f3n de puntos calientes en la barra de distribuci\u00f3n, as\u00ed como la ejecuci\u00f3n de pruebas el\u00e9ctricas al transformador de potencia de 5 MVA.<\/p>\n\n\n\n<p>De manera simult\u00e1nea, el personal especializado llev\u00f3 a cabo labores de desmalezamiento en las \u00e1reas internas, externas y en los cortafuegos de la subestaci\u00f3n, con el fin de prevenir la interferencia de la vegetaci\u00f3n con los tendidos, instalaciones el\u00e9ctricas y equipos.<\/p>\n\n\n\n<p>Estas acciones forman parte del Plan de Mantenimiento y Adecuaci\u00f3n de Circuitos y Subestaciones que ejecuta CORPOELEC para mejorar la operatividad del servicio el\u00e9ctrico.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realiz\u00f3 labores de mantenimiento preventivo en la subestaci\u00f3n El Sarao, ubicada en el<\/p>\n","protected":false},"author":24,"featured_media":97869,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2777,3058,2709,2752],"class_list":["post-97868","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-distribucion","tag-el-sarao","tag-miranda","tag-servicio"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97868","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97868"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97868\/revisions"}],"predecessor-version":[{"id":97870,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97868\/revisions\/97870"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97869"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97868"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97868"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97868"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}