{"id":97905,"date":"2025-06-17T14:58:23","date_gmt":"2025-06-17T14:58:23","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97905"},"modified":"2025-06-17T14:58:26","modified_gmt":"2025-06-17T14:58:26","slug":"instalan-transformadores-para-mejorar-servicio-electrico-en-comunidades-mirandinas","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97905","title":{"rendered":"Instalan transformadores para mejorar servicio el\u00e9ctrico en comunidades mirandinas"},"content":{"rendered":"\n<p><strong>Estado Miranda.-<\/strong> La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3, durante el mes de mayo, 55 transformadores de diferentes capacidades para favorecer a m\u00e1s de 7 mil usuarios mirandinos.<\/p>\n\n\n\n<p>El personal operativo sustituy\u00f3 22 equipos en las parroquias Santa Luc\u00eda, Santa Teresa del Tuy, C\u00faa, Charallave y Ocumare del Tuy, con la finalidad fortalecer los niveles de tensi\u00f3n en el sistema el\u00e9ctrico de la localidad.<\/p>\n\n\n\n<p>En Barlovento, los trabajadores instalaron 22 nuevos transformadores, para optimizar el funcionamiento de los circuitos San Mart\u00edn, Raizal, Colibr\u00ed, El Cristo, Centro Tur\u00edstico, entre otros, para favorecer a los habitantes de R\u00edo Chico, San Jos\u00e9, Paparo, Higuerote y Tacarigua.<\/p>\n\n\n\n<p>Asimismo, en los ejes Altos Mirandinos y Guarenas-Guatire, se efectu\u00f3 el montaje de 11 equipos en las parroquias Los Teques, Guatire, Bol\u00edvar y Guarenas.<\/p>\n\n\n\n<p>Con la activaci\u00f3n de estos nuevos dispositivos, con capacidades de 500, 300, 150, 100, 50, 37.5, 25, 15 y 13.8 kVA, CORPOELEC da cumplimiento con el Plan de Instalaci\u00f3n de Transformadores, impulsado por&nbsp; el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), para optimizar la distribuci\u00f3n de energ\u00eda en el estado.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) instal\u00f3, durante el mes de mayo, 55 transformadores de<\/p>\n","protected":false},"author":24,"featured_media":97906,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2709,11,2744,2751,46],"class_list":["post-97905","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-miranda","tag-mppee","tag-sen","tag-transformadores","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97905","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97905"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97905\/revisions"}],"predecessor-version":[{"id":97907,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97905\/revisions\/97907"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97906"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97905"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97905"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}