{"id":97931,"date":"2025-06-17T19:45:17","date_gmt":"2025-06-17T19:45:17","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=97931"},"modified":"2025-06-17T19:45:19","modified_gmt":"2025-06-17T19:45:19","slug":"favorecidas-3-mil-familias-paraguaneras-con-mantenimiento-en-subestacion-judibana","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=97931","title":{"rendered":"Favorecidas 3 mil familias paraguaneras con mantenimiento en subestaci\u00f3n Judibana"},"content":{"rendered":"\n<p><strong>Estado Falc\u00f3n.-<\/strong> La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), instal\u00f3 y activ\u00f3 equipo un interruptor de 15 kV\/ 800 amperios, en el circuito el\u00e9ctrico salida 10, asociado a la subestaci\u00f3n Judibana, para mejorar el servicio de energ\u00eda suministrado a 3 mil familias residentes del municipio Los Taques, en la Pen\u00ednsula de Paraguan\u00e1.<\/p>\n\n\n\n<p>En estas labores se realizaron pruebas para verificar el funcionamiento del interruptor, limpiaron, ajustaron torniller\u00eda y herrajes de los equipos el\u00e9ctricos, como parte del mantenimiento.<\/p>\n\n\n\n<p>Asimismo, se adecu\u00f3 la l\u00ednea a 13.8 kV del circuito el\u00e9ctrico salida 10, con retensado de conductor, cambio de aisladores y ajuste de puentes en m\u00e1s de 800 metros de l\u00ednea, lo que representa una mayor confiabilidad en el suministro el\u00e9ctrico en la entidad peninsular.<\/p>\n\n\n\n<p>Estos trabajos forman parte del Plan de Mantenimiento y Adecuaci\u00f3n a instalaciones el\u00e9ctricas, impulsado por el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE) a trav\u00e9s de CORPOELEC, para beneficiar de forma directa a las parroquias, Judibana y Punta Card\u00f3n de los municipios, Los Taques y Carirubana, en la Pen\u00ednsula de Paraguan\u00e1.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Falc\u00f3n.- La clase trabajadora de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC), instal\u00f3 y activ\u00f3 equipo un interruptor de 15 kV\/<\/p>\n","protected":false},"author":24,"featured_media":97932,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2695,11,2744,46],"class_list":["post-97931","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-falcon","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97931","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=97931"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97931\/revisions"}],"predecessor-version":[{"id":97933,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/97931\/revisions\/97933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/97932"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=97931"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=97931"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=97931"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}