{"id":98211,"date":"2025-06-30T18:19:38","date_gmt":"2025-06-30T18:19:38","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98211"},"modified":"2025-06-30T18:19:40","modified_gmt":"2025-06-30T18:19:40","slug":"corpoelec-mantiene-despliegue-permanente-en-zonas-trujillanas-golpeadas-por-onda-tropical-9","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98211","title":{"rendered":"CORPOELEC mantiene despliegue permanente en zonas trujillanas golpeadas por onda tropical 9"},"content":{"rendered":"\n<p><strong>Estado Trujillo.-<\/strong> Como parte de las acciones contempladas en el despliegue de la Fuerza de Tarea \u201cAndes 2025\u201d, instruida por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) se mantiene atendiendo las afectaciones causadas por el paso de la onda tropical 9 en el sistema el\u00e9ctrico del estado Trujillo.<\/p>\n\n\n\n<p>Entre las maniobras ejecutadas por los equipos t\u00e9cnicos se incluyen: mantenimiento en l\u00edneas rotas de alta tensi\u00f3n, reubicaci\u00f3n de postes y tendido el\u00e9ctrico.<\/p>\n\n\n\n<p>Asimismo, se avanza de manera oportuna y eficiente en la recuperaci\u00f3n de infraestructura que result\u00f3 afectada por las fuertes precipitaciones, espec\u00edficamente en los municipios Urdaneta, Bocon\u00f3 y Valera.<\/p>\n\n\n\n<p>En este sentido, se ha logrado el restablecimiento y la operatividad de los circuitos 13.8kV Jaj\u00f3, La Venta, El Cumbe, Campo El\u00edas, Burbusay y la l\u00ednea 34.5kV Trujillo &#8211; San Rafael &#8211; Bocon\u00f3, garantizando la estabilidad del sistema el\u00e9ctrico en las comunidades.<\/p>\n\n\n\n<p>CORPOELEC reitera su compromiso con el bienestar del pueblo trujillano, manteniendo su despliegue de forma ininterrumpida para dar soluciones a las comunidades andinas.<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Trujillo.- Como parte de las acciones contempladas en el despliegue de la Fuerza de Tarea \u201cAndes 2025\u201d, instruida por<\/p>\n","protected":false},"author":24,"featured_media":98212,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2702,46],"class_list":["post-98211","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-trujillo","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98211","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98211"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98211\/revisions"}],"predecessor-version":[{"id":98213,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98211\/revisions\/98213"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98212"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98211"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98211"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98211"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}