{"id":98232,"date":"2025-07-01T15:07:41","date_gmt":"2025-07-01T15:07:41","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98232"},"modified":"2025-07-01T15:07:44","modified_gmt":"2025-07-01T15:07:44","slug":"corpoelec-avanza-en-el-mantenimiento-preventivo-de-subestaciones-en-guarico","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98232","title":{"rendered":"CORPOELEC avanza en el mantenimiento preventivo de subestaciones en Gu\u00e1rico"},"content":{"rendered":"\n<p><strong>Estado Gu\u00e1rico.-&nbsp;<\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ha intensificado sus esfuerzos en el estado Gu\u00e1rico para optimizar el Sistema El\u00e9ctrico Nacional (SEN), logrando un progreso significativo en el mantenimiento preventivo de las subestaciones.<\/p>\n\n\n\n<p>En este sentido, la Corporaci\u00f3n complet\u00f3 el desmalezamiento en 20 instalaciones, lo que representa un 91.66% de la meta fijada para esta etapa.<\/p>\n\n\n\n<p>Los trabajos abarcaron 11 subestaciones de transmisi\u00f3n y 9 de distribuci\u00f3n, ubicadas estrat\u00e9gicamente en localidades como San Juan de los Morros, Valle de la Pascua, San Ger\u00f3nimo A y B, Cabruta, Carutal y El Sombrero.&nbsp;<\/p>\n\n\n\n<p>Estas acciones son fundamentales para asegurar la funcionalidad y el rendimiento \u00f3ptimo de la infraestructura el\u00e9ctrica en la regi\u00f3n y est\u00e1n contempladas en el Plan Nacional de Embellecimiento y Saneamiento de la Infraestructura El\u00e9ctrica, alineado con las pol\u00edticas del Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE).<\/p>\n\n\n\n<p>CORPOELEC reitera su compromiso con la estabilidad energ\u00e9tica, ejecutando trabajos integrales que buscan garantizar la fiabilidad del servicio y el bienestar de las comunidades en todo el territorio venezolano.&nbsp;<\/p>\n\n\n\n<p><strong>Prensa MPPEE-CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Gu\u00e1rico.-&nbsp;La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ha intensificado sus esfuerzos en el estado Gu\u00e1rico para optimizar el Sistema El\u00e9ctrico Nacional<\/p>\n","protected":false},"author":24,"featured_media":98233,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2729,11,2744,46],"class_list":["post-98232","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-guarico","tag-mppee","tag-sen","tag-venezuela"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98232"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98232\/revisions"}],"predecessor-version":[{"id":98234,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98232\/revisions\/98234"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98233"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}