{"id":98243,"date":"2025-07-02T16:52:24","date_gmt":"2025-07-02T16:52:24","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98243"},"modified":"2025-07-02T16:52:27","modified_gmt":"2025-07-02T16:52:27","slug":"abordaje-preventivo-en-subestaciones-asegura-distribucion-electrica-a-mas-de-21-mil-anzoatiguenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98243","title":{"rendered":"Abordaje preventivo en subestaciones asegura distribuci\u00f3n el\u00e9ctrica a m\u00e1s de 21 mil anzoatiguenses"},"content":{"rendered":"\n<p><strong>Puerto La Cruz, estado Anzo\u00e1tegui.-<\/strong> Los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecutaron labores preventivas en subestaciones de distribuci\u00f3n del estado Anzo\u00e1tegui, como parte de las acciones orientadas a garantizar un servicio m\u00e1s estable para m\u00e1s de 21 mil usuarios de los ejes norte, centro y sur de la entidad.<\/p>\n\n\n\n<p>En las subestaciones Santa Ana, Aragua de Barcelona, Pariagu\u00e1n y El Rinc\u00f3n, el equipo t\u00e9cnico realiz\u00f3 ajustes en reconectadores, adecuaciones en armarios de control, correcci\u00f3n de gradientes t\u00e9rmicos y mejoras en sistemas de protecci\u00f3n.<\/p>\n\n\n\n<p>Asimismo, se llevaron a cabo inspecciones en los p\u00f3rticos Clarines y El Hatillo, con el prop\u00f3sito de verificar el estado de sus elementos y avanzar en protocolo de prueba que permitan programar nuevas rutinas de soporte t\u00e9cnico preventivo y correctivo.<\/p>\n\n\n\n<p>El despliegue continuo en las instalaciones del Sistema El\u00e9ctrico Nacional (SEN) afianza el compromiso de brindar un suministro el\u00e9ctrico con mayor calidad, estabilidad y continuidad al pueblo venezolano.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Puerto La Cruz, estado Anzo\u00e1tegui.- Los trabajadores de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecutaron labores preventivas en subestaciones de distribuci\u00f3n<\/p>\n","protected":false},"author":24,"featured_media":98244,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2706,2704,2744,3057],"class_list":["post-98243","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-anzoategui","tag-mantenimiento","tag-sen","tag-subestaciones"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98243"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98243\/revisions"}],"predecessor-version":[{"id":98245,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98243\/revisions\/98245"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98244"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}