{"id":98252,"date":"2025-07-02T18:48:21","date_gmt":"2025-07-02T18:48:21","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98252"},"modified":"2025-07-02T19:17:21","modified_gmt":"2025-07-02T19:17:21","slug":"corpoelec-refuerza-despliegue-en-barinas-tras-onda-tropical-10","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98252","title":{"rendered":"CORPOELEC refuerza\u00a0despliegue en circuitos barineses tras onda tropical N\u00b0 10"},"content":{"rendered":"\n<p><strong>Estado Barinas.-<\/strong>\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) se mantiene desplegada para atender las redes de 14 circuitos del estado Barinas, luego de las lluvias generadas por el paso de la onda tropical N\u00b0 10.<\/p>\n\n\n\n<p>Entre las labores ejecutadas destacan el reemplazo de estructuras, reposici\u00f3n de l\u00edneas y sustituci\u00f3n de componentes el\u00e9ctricos esenciales, beneficiando a m\u00e1s de 100 mil usuarios de los municipios Antonio Jos\u00e9 de Sucre, Alberto Arvelo Torrealba, Cruz Paredes, Barinas, Bol\u00edvar, Ezequiel Zamora y Pedraza.<\/p>\n\n\n\n<p>De manera simult\u00e1nea, las cuadrillas t\u00e9cnicas aplicaron control de la vegetaci\u00f3n en tramos cr\u00edticos de los corredores de servicios en media y baja tensi\u00f3n.<\/p>\n\n\n\n<p>Los esfuerzos de CORPOELEC se integran con el despliegue de la Fuerza de Tarea \u201cAndes 2025\u201d, ordenada por el presidente de la Rep\u00fablica, Nicol\u00e1s Maduro, para brindar una respuesta oportuna y eficaz a los estados afectados por las recientes lluvias.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Barinas.-\u00a0La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) se mantiene desplegada para atender las redes de 14 circuitos del estado Barinas, luego<\/p>\n","protected":false},"author":24,"featured_media":98253,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2698,2824,2691],"class_list":["post-98252","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-barinas","tag-circuitos","tag-corpoelec"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98252","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98252"}],"version-history":[{"count":3,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98252\/revisions"}],"predecessor-version":[{"id":98257,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98252\/revisions\/98257"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98253"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98252"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98252"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98252"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}