{"id":98382,"date":"2025-07-06T18:26:05","date_gmt":"2025-07-06T18:26:05","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98382"},"modified":"2025-07-06T18:28:09","modified_gmt":"2025-07-06T18:28:09","slug":"realizan-trabajos-correctivos-en-linea-de-sub-transmision-en-34-5-kv-valera-la-puerta-jajo-timotes","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98382","title":{"rendered":"Realizan trabajos correctivos en l\u00ednea de sub-transmisi\u00f3n Valera &#8211; La Puerta &#8211; Jaj\u00f3 &#8211; Timotes"},"content":{"rendered":"\n<p><strong>Estado Trujillo.- <\/strong>La  Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) llev\u00f3 a cabo la rehabilitaci\u00f3n de la l\u00ednea de sub-transmisi\u00f3n en 34.5 kV Valera &#8211; La Puerta &#8211; Jaj\u00f3 &#8211; Timotes, que fueron afectadas al caer un pino de gran tama\u00f1o.<\/p>\n\n\n\n<p>Estas labores benefician a los usuarios de los sectores Los Cerrillos, La Puerta, Valera parte alta, Valerita, Carorita, El Horno, Jaj\u00f3, Tu\u00f1ame y aleda\u00f1os, impactando positivamente a m\u00e1s de 25 mil habitantes.<\/p>\n\n\n\n<p>Las cuadrillas de CORPOELEC, conformadas por m\u00e1s de 20 trabajadores realizaron el despeje del \u00e1rbol entre el tramo 78-79, colocaci\u00f3n de conductores, retensado de l\u00edneas, cambio de elementos y el mantenimiento correctivo de la infraestructura el\u00e9ctrica.<\/p>\n\n\n\n<p>La estatal el\u00e9ctrica busca optimizar la distribuci\u00f3n de energ\u00eda y asegurar que las comunidades de la regi\u00f3n cuenten con un suministro el\u00e9ctrico continuo y estable.<\/p>\n\n\n\n<p>La rehabilitaci\u00f3n de esta l\u00ednea es un paso significativo hacia el cumplimiento de los lineamientos del presidente Nicol\u00e1s Maduro de avanzar en el fortalecimiento del Sistema El\u00e9ctrico Nacional (SEN).<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Trujillo.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) llev\u00f3 a cabo la rehabilitaci\u00f3n de la l\u00ednea de sub-transmisi\u00f3n en 34.5 kV<\/p>\n","protected":false},"author":24,"featured_media":98383,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2798,2702],"class_list":["post-98382","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-transmision","tag-trujillo"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98382","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98382"}],"version-history":[{"count":2,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98382\/revisions"}],"predecessor-version":[{"id":98385,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98382\/revisions\/98385"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98383"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98382"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98382"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98382"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}