{"id":98412,"date":"2025-07-07T19:08:56","date_gmt":"2025-07-07T19:08:56","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98412"},"modified":"2025-07-07T19:12:34","modified_gmt":"2025-07-07T19:12:34","slug":"mantenimiento-a-subestaciones-mejora-servicio-de-cuatro-municipios-de-anzoategui","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98412","title":{"rendered":"Mantenimiento a subestaciones mejora servicio de tres municipios de Anzo\u00e1tegui"},"content":{"rendered":"\n<p><strong>Estado Anzo\u00e1tegui.- <\/strong>Como parte del Plan de Mantenimiento en la Subestaciones, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 maniobras en las instalaciones Guaraguao, Chupar\u00edn, Pariagu\u00e1n y Jos\u00e9, ubicadas en los municipios Sotillo, Bol\u00edvar y Miranda del estado Anzo\u00e1tegui.<\/p>\n\n\n\n<p>En la subestaci\u00f3n Guaraguao, el personal t\u00e9cnico puso en servicio un banco de condensadores para mejorar la entrega de energ\u00eda a Puerto La Cruz. En tanto, en Chupar\u00edn se realiz\u00f3 mantenimiento general que incluy\u00f3 pruebas a seccionadores e interruptores y correcci\u00f3n de gradientes t\u00e9rmicos en el tramo la l\u00ednea Barbacoa I \u2013 Chupar\u00edn en 115 kV.<\/p>\n\n\n\n<p>En Pariagu\u00e1n, se atendi\u00f3 el sistema de calefacci\u00f3n del interruptor M-505, reforzando su operatividad. Por su parte, en la subestaci\u00f3n Jos\u00e9 se corrigi\u00f3 el gradiente t\u00e9rmico del autotransformador N\u00b0 3 en 400\/230 kV, se ajust\u00f3 toda la torniller\u00eda y se realiz\u00f3 limpieza profunda de la celda de media tensi\u00f3n B-210.<\/p>\n\n\n\n<p>Con estas acciones, el Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), a trav\u00e9s de CORPOELEC, garantiza la confiabilidad y continuidad del suministro el\u00e9ctrico para el pueblo anzoatiguense.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Anzo\u00e1tegui.- Como parte del Plan de Mantenimiento en la Subestaciones, la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) ejecut\u00f3 maniobras en las<\/p>\n","protected":false},"author":24,"featured_media":98413,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2706,3099,2691,3098,3101,2704,3100,3057],"class_list":["post-98412","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-anzoategui","tag-chuparin","tag-corpoelec","tag-guaraguao","tag-jose","tag-mantenimiento","tag-pariaguan","tag-subestaciones"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98412","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98412"}],"version-history":[{"count":3,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98412\/revisions"}],"predecessor-version":[{"id":98416,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98412\/revisions\/98416"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98413"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98412"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98412"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98412"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}