{"id":98423,"date":"2025-07-08T09:00:34","date_gmt":"2025-07-08T09:00:34","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98423"},"modified":"2025-07-07T22:38:32","modified_gmt":"2025-07-07T22:38:32","slug":"mantenimiento-preventivo-beneficia-a-mas-de-110-mil-sucrenses","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98423","title":{"rendered":"Mantenimiento preventivo beneficia a m\u00e1s de 110 mil sucrenses"},"content":{"rendered":"\n<p><strong>Estado Sucre.- <\/strong>La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) llev\u00f3 a cabo labores de mantenimiento preventivo en la subestaci\u00f3n Car\u00fapano 115\/34.5\/13.8 kV, ubicada en el municipio Berm\u00fadez del estado Sucre, con el prop\u00f3sito de optimizar su funcionamiento en beneficio de m\u00e1s de 110 mil habitantes.<\/p>\n\n\n\n<p>La jornada incluy\u00f3 la correcci\u00f3n de puntos calientes, el ajuste de torniller\u00eda y la limpieza de elementos el\u00e9ctricos, garantizando as\u00ed el \u00f3ptimo desempe\u00f1o de los equipos y fortaleciendo la eficiencia y seguridad de las operaciones.<\/p>\n\n\n\n<p>Estas mejoras tendr\u00e1n un impacto significativo en las parroquias Santa Catalina, Bol\u00edvar, San Jos\u00e9 de Aerocuar, Macarapana, Santa Rosa, Tavera Acosta, El Rinc\u00f3n, El Morro de Puerto Santo y General Francisco Antonio V\u00e1squez.<\/p>\n\n\n\n<p>El Ministerio del Poder Popular para la Energ\u00eda El\u00e9ctrica (MPPEE), a trav\u00e9s de CORPOELEC, contin\u00faa brindando atenci\u00f3n directa a las comunidades del noreste de la regi\u00f3n oriental, promoviendo el desarrollo integral y el bienestar de sus pobladores.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Sucre.- La Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) llev\u00f3 a cabo labores de mantenimiento preventivo en la subestaci\u00f3n Car\u00fapano 115\/34.5\/13.8 kV,<\/p>\n","protected":false},"author":24,"featured_media":98426,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2691,2704,2693],"class_list":["post-98423","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-corpoelec","tag-mantenimiento","tag-sucre"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98423"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98423\/revisions"}],"predecessor-version":[{"id":98425,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98423\/revisions\/98425"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98426"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}