{"id":98451,"date":"2025-07-09T10:00:00","date_gmt":"2025-07-09T10:00:00","guid":{"rendered":"http:\/\/mppee.gob.ve\/?p=98451"},"modified":"2025-07-08T18:31:50","modified_gmt":"2025-07-08T18:31:50","slug":"despliegan-mantenimiento-correctivo-en-red-electrica-de-altos-mirandinos","status":"publish","type":"post","link":"https:\/\/mppee.gob.ve\/?p=98451","title":{"rendered":"Despliegan mantenimiento correctivo en red el\u00e9ctrica de Altos Mirandinos"},"content":{"rendered":"\n<p><strong>Estado Miranda.- <\/strong>Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realizaron labores correctivas en la red el\u00e9ctrica de los Altos Mirandinos, con el objetivo de garantizar un servicio el\u00e9ctrico eficiente y continuo.<\/p>\n\n\n\n<p>En el municipio Los Salias, espec\u00edficamente en los sectores El Sitio, Los Castores y El Amarillo, se ejecutaron trabajos de control de vegetaci\u00f3n que interfer\u00eda con los conductores el\u00e9ctricos de media tensi\u00f3n. Adem\u00e1s, fueron sustituidas estructuras e instaladas nuevas piezas dentro de tanquillas.<\/p>\n\n\n\n<p>En el municipio Carrizal, los operarios llevaron a cabo podas puntuales para despejar las l\u00edneas de media tensi\u00f3n asociadas a los circuitos de la subestaci\u00f3n Barbecho.<\/p>\n\n\n\n<p>Por su parte, en Los Teques se efectu\u00f3 el reemplazo de componentes el\u00e9ctricos dentro de subterr\u00e1neos ubicadas en la calle 19 de Abril con Miranda.<\/p>\n\n\n\n<p>Con estas acciones, los trabajadores de CORPOELEC reafirman su compromiso con la poblaci\u00f3n venezolana y garantiza la continuidad del servicio el\u00e9ctrico en la regi\u00f3n.<\/p>\n\n\n\n<p><strong>Prensa MPPEE &#8211; CORPOELEC<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Estado Miranda.- Las cuadrillas de la Corporaci\u00f3n El\u00e9ctrica Nacional (CORPOELEC) realizaron labores correctivas en la red el\u00e9ctrica de los Altos<\/p>\n","protected":false},"author":24,"featured_media":98458,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[2847,2846,2691,3093,3106,2709],"class_list":["post-98451","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-regionales","tag-altos-mirandinos","tag-carrizal","tag-corpoelec","tag-los-salias","tag-los-teques","tag-miranda"],"_links":{"self":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98451","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/users\/24"}],"replies":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=98451"}],"version-history":[{"count":1,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98451\/revisions"}],"predecessor-version":[{"id":98452,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/posts\/98451\/revisions\/98452"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=\/wp\/v2\/media\/98458"}],"wp:attachment":[{"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=98451"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=98451"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mppee.gob.ve\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=98451"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}